Rack Assembly
Assembling the bottom section
The bottom section of the rack will contain shelves #3 and #4.
1.Bolt Cross Bar #1 to Bottom Side Subassembly #1 at hole position #2 (from front) on the LOWER horizontal support of the Subassembly. Use (1)
(2) 3/8 washers and (1) 3/8 KEPS nut.
Bottom Side Subassembly #1 | ||
|
3/8 Washers
3/8 KEPS Nut
Hole Position #2(812-3101)from Front
Cross Bar #1
2.Bolt Cross Bar #2 to Bottom Side Subassembly #1 at hole position #6 (from front) on the LOWER horizontal support of the Subassembly. Use (1)
(2) 3/8 washers and (1) 3/8 KEPS nut.
Bottom Side Subassembly #1
Hole Position #6
from Front
Cross Bar #2
Cross Bar #1
Battery Rack Assembly and Installation Manual | 9 |