Rack Assembly
3.Using specified cable, connect the open BAT 2+ terminal in Terminal Block #2 to the open positive (+) terminal on Battery #33. Before making connections, apply ONE cable boot. If lug sizes are different, apply boot to the cable end with the SMALLER lug.
At Terminal Block #2: Connect the lug on the cable end WITHOUT the boot to the open BAT 2+ terminal. Secure lug to stud with preset washer and nut. Snake cable end WITH the boot between centrally located rails until it reaches Battery #33.
At Battery #33: Connect the lug on the cable end WITH the boot to the open positive (+) terminal on Battery #33. Snap the boot over the connected lug/terminal. Use zip ties as needed to relieve cable strain.
36 | 40 | |
to Battery #41 | ||
35 | 39 |
|
34 | 38 |
|
33 | 37 |
|
Rack #2, Top Shelf |
| |
Terminal Block #2 |
|
|
+ | - |
|
Battery Rack Assembly and Installation Manual | 31 |