American Power Conversion 400kW1MW installation manual Appendix C Employing Sidecars

Page 55

Appendix C: Employing Sidecars

4.Using one (1) 120 mm2 [#4/0] cable, connect the BAT 2- terminal in Terminal Block #2 to either of the two BAT 2- vertical bars in the Sidecar.

At Terminal Block #2: If using top cable entry, connect to top terminal (as shown) of the BAT 2- segment on right. Otherwise, connect to bottom terminal. Secure lug to stud with preset washer and nut. To relieve strain, zip tie cable to the shelf directly above the terminal block.

To BAT 2-

+-

Terminal Block #2

At the Sidecar: Connect other cable end to one of the single-hole landings atop either of the BAT 2- vertical bars. Secure lug to landing with M10 [3/8”] bolt, washer, lock washer, and hex nut (hardware is not supplied).

To BAT 2-

5.To connect additional racks to this same sidecar, repeat steps 1-4, while using different landing holes on the sidecar’s vertical bars.

Battery Rack Assembly and Installation Manual

49

Image 55
Contents Assembly and Installation Manual Battery Racks for 400kW-1MW UPS SystemsBattery Rack Assembly and Installation Manual Contents Rack Assembly Appendix C Employing Sidecars Battery Rack Assembly and Installation Manual Safety warnings SafetySafety precautions Additional considerations Rack/battery options SpecificationsWeights and dimensions Shipping Shipping and ReceivingReceiving Positioning PlacementHandling Torque specifications Installation SiteInstallation considerations Installation equipmentAPC P/N Parts ListBattery Cabling Assembling the bottom section Rack AssemblyRefer to graphic in below Assembling the top section Top Side Subassembly #2 870-1657A Bottom Side Subassembly #2 Top Side Subassembly #1 Cross Bar #6 Top Side Subassembly #2 Connection Stabilizing the rack Anchoring the rack optional Accessing your wiring diagramsNumbering the batteries Addressing the bottom shelf Positioning rails on shelvesWiring the batteries Rack Assembly Stud Terminal Addressing the second shelf Addressing the third shelfAddressing the top shelf Shelf-to-shelf wiring Assembling the second rack Employing sidecars to support separated racks Labelling the terminal blocksConnecting terminal blocks to battery breakers To Battery Breaker #1 BAT 1- terminal Connecting terminal blocks to batteries Rack #1, Top Shelf Terminal Block #1 Shelf-to-shelf From Battery #24 Rack #2, Top Shelf Terminal Block #2 Shelf-to-shelf From Battery #56 Applying warning labels Reattaching terminal block coversGrounding the racks APC GlossaryStyle E, rack #1, shelf #1 top Appendix a Battery Wiring Style EStyle E, rack #1, shelf #2 Style E, rack #1, shelf #3 Style E, rack #1, shelf #4 bottom Style E, rack #2, shelf #1 top Style E, rack #2, shelf #2 Style E, rack #2, shelf #3 Style E, rack #2, shelf #4 bottom References for Power battery cables Appendix B Battery Cabling KitsReferences for Fiamm battery cables Sidecar overview Appendix C Employing SidecarsPositioning and accessing the sidecar Connecting terminal blocks to sidecars To BAT To BAT 2+ Appendix C Employing Sidecars At the Sidecar Connecting sidecars to battery breakersBAT 2+ Top BAT BAT 1+ Top Battery Rack Assembly and Installation Manual Battery Rack Assembly and Installation Manual Battery Rack Assembly and Installation Manual APC Warranty on Batteries 990-4194A APC Worldwide Customer Support03/2004