American Power Conversion 400kW1MW installation manual Wiring the batteries

Page 24

Rack Assembly

3.Using a rated lifting device, load batteries onto BOTTOM shelf rails in accordance with your wiring diagram for that shelf. Take note of where each numbered battery should be placed, and the proper positioning of its positive and negative terminals.

Because batteries are loaded from bottom-to-top in the rack, the higher- numbered batteries are placed on the lower shelves.

Prior to loading batteries, use a voltmeter to ensure each battery contains its

Note

required 12V. DO NOT load any battery with an insufficient voltage!

Leave a minimum space of 5 mm (.2 in) between batteries in the same row.

Positive Terminal

28

27

26

5 mm [.2]

5 mm [.2]

Negative Terminal

Wiring the batteries

All of the batteries loaded onto a given shelf must be connected (wired) in numerical sequence before starting assembly of the next shelf. These connections consist of battery-to-battery and row-to-row wiring.

Review “Safety” on page 1 for safety warnings and caution notices. Take heed of all safety information before proceeding with battery connections. Failure to

Warning comply could result in serious injury or death!

1.Connect all batteries in the same row (those on the same rails) using the supplied battery-to- battery cable.

Refer to your wiring diagrams for proper cabling and termination points.

Refer to instructions for “Applying cable boots” on page 19, “Connecting to batteries” on page 20, and “Covering battery connections” on page 21.

Prior to connecting batteries, use a voltmeter to check the voltage between those terminals being connected. Any reading other than zero is unacceptable.

After connecting each row, use voltmeter to measure the collective voltage.

Note

Reading should approximate number of batteries in row times 12V.

18

Battery Rack Assembly and Installation Manual

Image 24
Contents Battery Racks for 400kW-1MW UPS Systems Assembly and Installation ManualBattery Rack Assembly and Installation Manual Contents Rack Assembly Appendix C Employing Sidecars Battery Rack Assembly and Installation Manual Safety Safety warningsSafety precautions Additional considerations Specifications Rack/battery optionsWeights and dimensions Shipping and Receiving ShippingReceiving Placement PositioningHandling Installation Site Installation considerationsInstallation equipment Torque specificationsParts List APC P/NBattery Cabling Rack Assembly Assembling the bottom sectionRefer to graphic in below Assembling the top section Top Side Subassembly #2 870-1657A Bottom Side Subassembly #2 Top Side Subassembly #1 Cross Bar #6 Top Side Subassembly #2 Connection Stabilizing the rack Accessing your wiring diagrams Anchoring the rack optionalNumbering the batteries Positioning rails on shelves Addressing the bottom shelfWiring the batteries Rack Assembly Stud Terminal Addressing the third shelf Addressing the second shelfAddressing the top shelf Shelf-to-shelf wiring Assembling the second rack Labelling the terminal blocks Employing sidecars to support separated racksConnecting terminal blocks to battery breakers To Battery Breaker #1 BAT 1- terminal Connecting terminal blocks to batteries Rack #1, Top Shelf Terminal Block #1 Shelf-to-shelf From Battery #24 Rack #2, Top Shelf Terminal Block #2 Shelf-to-shelf From Battery #56 Reattaching terminal block covers Applying warning labelsGrounding the racks Glossary APCAppendix a Battery Wiring Style E Style E, rack #1, shelf #1 topStyle E, rack #1, shelf #2 Style E, rack #1, shelf #3 Style E, rack #1, shelf #4 bottom Style E, rack #2, shelf #1 top Style E, rack #2, shelf #2 Style E, rack #2, shelf #3 Style E, rack #2, shelf #4 bottom Appendix B Battery Cabling Kits References for Power battery cablesReferences for Fiamm battery cables Appendix C Employing Sidecars Sidecar overviewPositioning and accessing the sidecar Connecting terminal blocks to sidecars To BAT To BAT 2+ Appendix C Employing Sidecars Connecting sidecars to battery breakers At the SidecarBAT 2+ Top BAT BAT 1+ Top Battery Rack Assembly and Installation Manual Battery Rack Assembly and Installation Manual Battery Rack Assembly and Installation Manual APC Warranty on Batteries APC Worldwide Customer Support 990-4194A03/2004