Glossary

AH

Ampere-hour

in-lbs

Inch-pounds

APC

American Power Conversion

kg

Kilogram

battery rails

Adjustable rails that rest on

lb

Pound

 

cross bars and hold batteries

 

 

BOM

Bill of Materials

mm

Millimeter

C

Centigrade (degrees)

Ohmmeter

Instrument used to indicate

 

 

 

resistance (in ohms)

cross bars

Bars between subassemblies

p/n

Part number

 

that support battery rails

 

 

cross braces

Rack stabilizing braces between

shims

Metal spacers used to level

 

subassemblies

 

rack due to uneven flooring

electrolyte

A non-metallic electrical

subassembly

A component part comprised

 

conductor

 

of other parts

F

Fahrenheit (degrees)

torque

Tightening measure applied to

 

 

 

nuts and bolts

frame

Main support structure of

UPS

Uninterruptible Power Supply

 

battery rack

 

 

IEC

International Electric Code

 

 

34

Battery Rack Assembly and Installation Manual

Image 40
Contents Battery Racks for 400kW-1MW UPS Systems Assembly and Installation ManualBattery Rack Assembly and Installation Manual Contents Rack Assembly Appendix C Employing Sidecars Battery Rack Assembly and Installation Manual Safety warnings SafetySafety precautions Additional considerations Rack/battery options SpecificationsWeights and dimensions Shipping Shipping and ReceivingReceiving Positioning PlacementHandling Installation Site Installation considerationsInstallation equipment Torque specificationsParts List APC P/NBattery Cabling Rack Assembly Assembling the bottom sectionRefer to graphic in below Assembling the top section Top Side Subassembly #2 870-1657A Bottom Side Subassembly #2 Top Side Subassembly #1 Cross Bar #6 Top Side Subassembly #2 Connection Stabilizing the rack Anchoring the rack optional Accessing your wiring diagramsNumbering the batteries Positioning rails on shelves Addressing the bottom shelfWiring the batteries Rack Assembly Stud Terminal Addressing the third shelf Addressing the second shelfAddressing the top shelf Shelf-to-shelf wiring Assembling the second rack Labelling the terminal blocks Employing sidecars to support separated racksConnecting terminal blocks to battery breakers To Battery Breaker #1 BAT 1- terminal Connecting terminal blocks to batteries Rack #1, Top Shelf Terminal Block #1 Shelf-to-shelf From Battery #24 Rack #2, Top Shelf Terminal Block #2 Shelf-to-shelf From Battery #56 Applying warning labels Reattaching terminal block coversGrounding the racks Glossary APCAppendix a Battery Wiring Style E Style E, rack #1, shelf #1 topStyle E, rack #1, shelf #2 Style E, rack #1, shelf #3 Style E, rack #1, shelf #4 bottom Style E, rack #2, shelf #1 top Style E, rack #2, shelf #2 Style E, rack #2, shelf #3 Style E, rack #2, shelf #4 bottom References for Power battery cables Appendix B Battery Cabling KitsReferences for Fiamm battery cables Appendix C Employing Sidecars Sidecar overviewPositioning and accessing the sidecar Connecting terminal blocks to sidecars To BAT To BAT 2+ Appendix C Employing Sidecars Connecting sidecars to battery breakers At the SidecarBAT 2+ Top BAT BAT 1+ Top Battery Rack Assembly and Installation Manual Battery Rack Assembly and Installation Manual Battery Rack Assembly and Installation Manual APC Warranty on Batteries 990-4194A APC Worldwide Customer Support03/2004