Teledyne 4060 Preliminary Power-Off Check List, Activating the Support Gases, Operation Series

Page 42

Operation

Series 4060

 

 

 

 

CAUTION: THE GASES USED MUST BE OF THE HIGHEST QUALITY, ULTRA ZERO GRADES, AS SHOWN BELOW. FAILURE TO DO SO WILL RESULT IN CONTAMINATION AND FAILURE TO DETECT LOW PPB BENZENE.

AIR: USE WATER PUMPED AIR WITH THC LESS THAN 0.1 PPM. DO NOT USE OIL PUMPED AIR UNDER ANY CIRCUMSTANCES.

FUEL: HYDROGEN GAS, 100%, ZERO QUALITY WITH THC LESS THAN 0.5 PPM.

CARRIER GAS: NITROGEN GAS, ULTRA ZERO GRADE WITH THC LESS THAN 0.05 PPM.

4.2 Preliminary Power-Off Check List

Make the following checks of the installation before proceeding further into the start-up procedure:

1.Check to see that the sample and supporting gas installation is in accordance with the specifications called for in the installation and application sections of the manual (Chapter 3). Be sure that the supporting gases are of the proper composition and are connected to the correct fittings at the rear of the analyzer.

2.Check to see that the electrical installation conforms to the instructions contained in the installation section (Chapter 3) and on the input-output diagram.

3.Open the door and check to see that the printed circuit boards and cables are firmly seated in their respective sockets.

4.Confirm that recorder and alarm connections are properly made.

4.3Activating the Support Gases

All gas controls are located on the front panel as shown in Figure 1-

1.

42

Teledyne Analytical Instruments

Image 42
Contents Series Series Teledyne Analytical InstrumentsSafety Messages Teledyne Analytical Instruments IiiSeries Additional Safety Information Combustible GAS UsageSeries Procedure for Removal of Internal Inaccessible Shock Hazards Teledyne Analytical Instruments ViiViii Table of Contents Operation Maintenance & Troubleshooting Appendix Appendix BList of Figures Teledyne Analytical Instruments XiiiList of Tables Main Features of the Analyzer IntroductionSeries Introduction Principle of Operation Analyzer DescriptionIntroduction Series Model 4060 Front Panel Interface Applications Modes of Operation Operational TheoryIntroduction Series Operational TheoryAnalyzer Subsystems Operational Theory SeriesSample System Internal Temperature Controllers Gas Flow Control SystemFuel and Blanket Air Systems Flame Ionization Detection CellTypical Piping Diagram for the Model Detection Cell Electrometer-Amplifier Flame Ionization CellAnode Power Supply Flame Guard CircuitFlame Ignition Circuit Unpacking the Analyzer InstallationSeries Installation Mounting the AnalyzerUser Connections Installation SeriesElectrical Power Connections Electronic ConnectionsModel 4060 Rear Panel with Optional Gas Manifold Equipment Interface Connector Pin Arrangement Pin Function Threshold Alarm System Alarm Remote Calibration Connections Range ID Relay Connections Pin out of 50 pin D-Sub Connector 2.10 RS-232 PortCommands via RS-232 Input Gas ConnectionsGas Connections Less than 0.5 PPM Placing the System in Operation Operation EquipmentSeries Operation Preliminary Power-Off Check List Activating the Support GasesOperation Series Carrier Gas Flame Ignition1 Air Span GasVerification of the Flame Guard Circuit Sample PumpAnalyzer Operation Ignition and/or Flame Guard Circuit FailureSeries Operation Default Parameters Style ConventionsNavigation and Data Entry EnterEscape Menu StructureMain Menus Span System Self-Diagnostic Test ALT-SPANModel Screen Alarms Function AL-1 Defeated AL-1 High AL-1 NON-FAILSAFE AL-1 NON-LATCHING Operation Series Analog Output Adjustment Range FunctionSetting up an AUTO-CAL LinearizationChanging Stream Autocal Password Group Setup Password ProtectionTiming Entering a Password Enter NEW Password Screen Repeat Password Entry Screen Logging OutStandby Series Operation Operation Series Teledyne Analytical Instruments Maintenance & Troubleshooting Series MaintenanceMaintenance Series Measuring Circuit Electrical ChecksAnode Voltage Check Printed Circuit Board Replacement Electronic StabilityTemperature Control Electronic Check Collector CableIgnition and/or Flame Guard Circuit Checks Sampling System Flame Guard and Anode Power Supply PCB Printed Circuit Board DescriptionsProportional Temperature Controller PCB Electrometer-Amplifier PCB Maintenance Series Specifications and Initial Settings AppendixSeries Appendix Recommended Spare Parts List Appendix SeriesAnalytical Instruments Drawing List PC Board AssembliesAppendix Series Teledyne Analytical Instruments B1 Addendum and Testing Results Appendix B