Sterling 882.00255.00 CV3-655 specifications Setting Up Stations, Setting Up a Single Station

Page 42

Setting Up Stations

Before starting the system, you must define several settings for each station, such as which pump conveys material to it and whether the station has a slide gate. This section first discusses how to use the controller’s menu system to configure stations. The table on pp. 64– 68 discusses the individual choices.

Setting Up a Single Station

1.Go to the Station Status screen if needed.

To reach this screen from any other screen, touch Stations on the right-hand side of the screen. The Station Status screen appears. Depending on which model you have, your screen will appear as one of the following:

2.Touch the icon for the station you want to set up, and hold it for several seconds. The Station n Operator Settings screen for the selected station appears:

Touch Station Setup at the Station n Operator Settings screen.

The Station n Setup screen appears:

24-Pump, 128-Station Controller

Chapter 3: Installation

41

Image 42
Contents SCC 24-Pump 128-Station Controller Parts and Service Department Shipping Information Table of Contents Maintenance Safety How to Use This ManualSafety Symbols Used in this Manual Wear Safety Glasses and Work Gloves Responsibility General ResponsibilityOperator Responsibility Maintenance Responsibility Reporting a Safety DefectFunctional Description Standard FeaturesMechanical Features Models Covered in This ManualElectrical Features Optional FeaturesSafety Devices and Interlocks Controller FeaturesSafety Circuit Standards Safety Device Lock-OutsFail Safe Operation Uncrating InstallationSystem Installation Overview Mounting the Control PanelElectrical Connections Making Control Panel Power Drop Wiring ConnectionsInstalling KwikLink Cable Running KwikLink CablesSetting Up and Installing Mounting Plates Setting Up Mounting PlatesInstalling Assembled Mounting Plates Terminating Cable RunsInstalling Inside KwikLink Connectors with Blank Caps Discard the standard resistor cap to eliminate confusionAddressing and Installing ArmorBlocks Addressing ArmorBlocksArmorBlock Address Ranges Setting ArmorBlock Addresses Using seal block to pierce cable Installing KwikLink Connectors Connecting the Controller to the Network Connecting the Remote Interface to the Main ControllerPage Connecting the Power Supply Enclosure to the Network Proper Controller and Remote Interface ConnectionsPage Proper Power Supply Enclosure Connections Connecting Vacuum Receivers to the Network24/128 8-Connector ArmorBlock Connections Proper Vacuum Receiver Connections Connecting Vacuum Pumps and Filter Chambers to the Network Connecting Vacuum PumpsProper Vacuum Pump Connections, Standard XPD/XPC Pumps Proper Vacuum Pump Connections, Xpdb Pump Connecting Filter Chambers Proper Filter Chamber Connections, Blowback Proper Filter Chamber Connections, Implosion Type Connecting Central Alarms to the Network Proper Central Alarm Connections Setup Connector ArmorBlock Connections for Central AlarmsSetting Up the System Setting the Number of Stations and the Number of PumpsSetting the Date/Time Checking Addressing and Wiring for System ComponentsNaming Purge Valves and Materials Setting Up Alarm Silences Alarm Horn Silence Setting Up Pump StagingSetting Up Stations Setting Up a Single StationNaming Stations Copying Settings from One Station to Others To copy the selected station’s settings to one other stationSetting Up Pumps Setting Up a Single PumpPage Copying Settings from One Pump to Others Naming PumpsTo copy the selected pump’s settings to one other pump To copy the current pump’s settings to all other pumpsFinishing Setup Setting Up Passwords Password Duration Save/Restore SettingsInitial Startup Operation OverviewStarting and Stopping the System Basic Tasks Reviewing Station StatusReviewing Pump Status Color Label DescriptionLogging On and Logging Off Enter the alphanumeric password Enabling and Disabling Stations and PumpsReviewing and Adjusting Basic Station Settings Reaching and Reading the Station Operator ScreensNavigating among the Station Operator Screens Adjusting Convey Time and Dump Delay Activating and Stopping Priority Convey for a StationChanging the Mixture for a Remote Proportioning Valve Reviewing and Resetting a Pump Hour Meter Advanced TasksTransferring Stations to a Standby Pump Page Page Alarms Reviewing AlarmsSilencing Alarms Corrective Maintenance MaintenancePreventative Maintenance Network Scanner Module ConsiderationsConfigurable Settings Options for Station SetupMemory Module Considerations Name Description Options Default Conveying Options Option Input Pump, 128-Station Controller Configurable Settings Pump, 128-Station Controller Configurable Settings Options for Pump Setup Pump, 128-Station Controller Configurable Settings Troubleshooting General TroubleshootingStation Alarms Alarm message Possible causePump, 128-Station Controller Troubleshooting Pump Alarms System AlarmsWarranty AppendixOptional Components Drawings and Diagrams 24-Pump, 128-Station Controller with 10 DisplaySpare Parts List Typical System Installation LayoutWarranty Returns Returned Material PolicyCredit Returns Safety Tag Information Controller Safety TagsController Identification Serial Number Tag Parts Department Service DepartmentTechnical Assistance Contact Information Sales Department