Sterling 882.00255.00 CV3-655 specifications Using seal block to pierce cable

Page 20

Figure 5: ArmorBlock Address Node Rotary Switches

Installing ArmorBlocks

The ArmorBlock cable base should already be attached to the mounting plate, aligned so it is perpendicular to the flat cables. If not, reinstall it with its proper alignment.

To install the flat cables in the ArmorBlock cable base:

1.Lay the flat cable into the ArmorBlock cable base, grey data cable on the bottom and the black power cable on the top, making sure that the keyed edge is properly seated toward the top.

Caution! EXERCISE CARE when handling the seal block. Cable contacts are SHARP!

Only ONE attempt to pierce the cable is allowed for proper contact.

Figure 6: Using seal block to pierce cable

2.Align the seal block so the L-shaped tabs are towards the top, and the arrows are matched on the bottom of the cable base and seal block. Make sure that the arrows and the four captive screws on the seal block are properly aligned. Gently press it into place.

Make sure that you align the seal block properly when you attach it to the base. Doing so maintains the integrity of the sealed base.

Note: You can only pierce the cable once. Once pierced, the seal block must not be removed. This insures that the inner conductors are not exposed to the elements.

Figure 7: Securing the Seal Block to the Cable Base

24-Pump, 128-Station Controller

Chapter 3: Installation

19

Image 20
Contents SCC 24-Pump 128-Station Controller Parts and Service Department Shipping Information Table of Contents Maintenance Safety Symbols Used in this Manual SafetyHow to Use This Manual Wear Safety Glasses and Work Gloves Operator Responsibility ResponsibilityGeneral Responsibility Maintenance Responsibility Reporting a Safety DefectStandard Features Mechanical FeaturesFunctional Description Models Covered in This ManualOptional Features Safety Devices and InterlocksElectrical Features Controller FeaturesFail Safe Operation Safety Circuit StandardsSafety Device Lock-Outs Installation System Installation OverviewUncrating Mounting the Control PanelMaking Control Panel Power Drop Wiring Connections Installing KwikLink CableElectrical Connections Running KwikLink CablesSetting Up and Installing Mounting Plates Setting Up Mounting PlatesInstalling Assembled Mounting Plates Terminating Cable RunsInstalling Inside KwikLink Connectors with Blank Caps Discard the standard resistor cap to eliminate confusionArmorBlock Address Ranges Addressing and Installing ArmorBlocksAddressing ArmorBlocks Setting ArmorBlock Addresses Using seal block to pierce cable Installing KwikLink Connectors Connecting the Controller to the Network Connecting the Remote Interface to the Main ControllerPage Connecting the Power Supply Enclosure to the Network Proper Controller and Remote Interface ConnectionsPage Proper Power Supply Enclosure Connections Connecting Vacuum Receivers to the Network24/128 8-Connector ArmorBlock Connections Proper Vacuum Receiver Connections Connecting Vacuum Pumps and Filter Chambers to the Network Connecting Vacuum PumpsProper Vacuum Pump Connections, Standard XPD/XPC Pumps Proper Vacuum Pump Connections, Xpdb Pump Connecting Filter Chambers Proper Filter Chamber Connections, Blowback Proper Filter Chamber Connections, Implosion Type Connecting Central Alarms to the Network Proper Central Alarm Connections Setup Connector ArmorBlock Connections for Central AlarmsSetting Up the System Setting the Number of Stations and the Number of PumpsNaming Purge Valves and Materials Setting the Date/TimeChecking Addressing and Wiring for System Components Setting Up Alarm Silences Alarm Horn Silence Setting Up Pump StagingSetting Up Stations Setting Up a Single StationNaming Stations Copying Settings from One Station to Others To copy the selected station’s settings to one other stationSetting Up Pumps Setting Up a Single PumpPage Copying Settings from One Pump to Others Naming PumpsTo copy the selected pump’s settings to one other pump To copy the current pump’s settings to all other pumpsFinishing Setup Setting Up Passwords Password Duration Save/Restore SettingsInitial Startup Starting and Stopping the System OperationOverview Basic Tasks Reviewing Station StatusReviewing Pump Status Color Label DescriptionLogging On and Logging Off Enter the alphanumeric password Enabling and Disabling Stations and PumpsNavigating among the Station Operator Screens Reviewing and Adjusting Basic Station SettingsReaching and Reading the Station Operator Screens Adjusting Convey Time and Dump Delay Activating and Stopping Priority Convey for a StationChanging the Mixture for a Remote Proportioning Valve Transferring Stations to a Standby Pump Reviewing and Resetting a Pump Hour MeterAdvanced Tasks Page Page Silencing Alarms AlarmsReviewing Alarms Maintenance Preventative MaintenanceCorrective Maintenance Network Scanner Module ConsiderationsMemory Module Considerations Configurable SettingsOptions for Station Setup Name Description Options Default Conveying Options Option Input Pump, 128-Station Controller Configurable Settings Pump, 128-Station Controller Configurable Settings Options for Pump Setup Pump, 128-Station Controller Configurable Settings Troubleshooting General TroubleshootingStation Alarms Alarm message Possible causePump, 128-Station Controller Troubleshooting Pump Alarms System AlarmsOptional Components WarrantyAppendix Drawings and Diagrams 24-Pump, 128-Station Controller with 10 DisplaySpare Parts List Typical System Installation LayoutCredit Returns Warranty ReturnsReturned Material Policy Controller Identification Serial Number Tag Safety Tag InformationController Safety Tags Service Department Technical Assistance Contact InformationParts Department Sales Department