shutdown delay, alarms, or blowback to the standby pump. Mechanical connections must be changed manually.

To transfer stations from a pump to a standby pump:

1.At any screen, touch Pumps. The Pump Status screen appears.

2.Both the source pump and the standby pump must be offline. If either pump is any other state, disable it by touching its icon briefly.

The icon becomes greny.

3.Move the vacuum hose from the failed pump to the standby pump, and carry out any other mechanical procedures needed to use the standby pump.

4.At the Pump Status screen, touch and hold the icon for any pump until the Pump n Setup screen appears.

5.At the Pump n Setup screen, touch Transfer Stations To Standby Pump. The Transfer to Standby Pump screen appears:

6.Touch Source Pump.

A list of available pumps pops up.

7.Scroll through the list to choose a source pump. Press Return once you have selected and highlighted your desired source pump.

The number appears under Source Pump.

8.Touch Destination Pump.

A list of available pumps pops up.

9.Scroll through the list of pumps to choose a destination pump. Press Return once you have selected and highlighted your desired destination pump.

The number appears under Standby Pump, and a button labeled Press to Move Stations appears on the screen:

24-Pump, 128-Station Controller

Chapter 4: Operation

60

Image 61
Contents SCC 24-Pump 128-Station Controller Parts and Service Department Shipping Information Table of Contents Maintenance How to Use This Manual SafetySafety Symbols Used in this Manual Wear Safety Glasses and Work Gloves General Responsibility ResponsibilityOperator Responsibility Reporting a Safety Defect Maintenance ResponsibilityMechanical Features Standard FeaturesFunctional Description Models Covered in This ManualSafety Devices and Interlocks Optional FeaturesElectrical Features Controller FeaturesSafety Device Lock-Outs Safety Circuit StandardsFail Safe Operation System Installation Overview InstallationUncrating Mounting the Control PanelInstalling KwikLink Cable Making Control Panel Power Drop Wiring ConnectionsElectrical Connections Running KwikLink CablesSetting Up Mounting Plates Setting Up and Installing Mounting PlatesTerminating Cable Runs Installing Assembled Mounting PlatesDiscard the standard resistor cap to eliminate confusion Installing Inside KwikLink Connectors with Blank CapsAddressing ArmorBlocks Addressing and Installing ArmorBlocksArmorBlock Address Ranges Setting ArmorBlock Addresses Using seal block to pierce cable Installing KwikLink Connectors Connecting the Remote Interface to the Main Controller Connecting the Controller to the NetworkPage Proper Controller and Remote Interface Connections Connecting the Power Supply Enclosure to the NetworkPage Connecting Vacuum Receivers to the Network Proper Power Supply Enclosure Connections24/128 8-Connector ArmorBlock Connections Proper Vacuum Receiver Connections Connecting Vacuum Pumps Connecting Vacuum Pumps and Filter Chambers to the NetworkProper Vacuum Pump Connections, Standard XPD/XPC Pumps Proper Vacuum Pump Connections, Xpdb Pump Connecting Filter Chambers Proper Filter Chamber Connections, Blowback Proper Filter Chamber Connections, Implosion Type Connecting Central Alarms to the Network Proper Central Alarm Connections Connector ArmorBlock Connections for Central Alarms SetupSetting the Number of Stations and the Number of Pumps Setting Up the SystemChecking Addressing and Wiring for System Components Setting the Date/TimeNaming Purge Valves and Materials Setting Up Alarm Silences Setting Up Pump Staging Alarm Horn SilenceSetting Up a Single Station Setting Up StationsNaming Stations To copy the selected station’s settings to one other station Copying Settings from One Station to OthersSetting Up a Single Pump Setting Up PumpsPage Naming Pumps Copying Settings from One Pump to OthersTo copy the current pump’s settings to all other pumps To copy the selected pump’s settings to one other pumpFinishing Setup Setting Up Passwords Save/Restore Settings Password DurationInitial Startup Overview OperationStarting and Stopping the System Reviewing Station Status Basic TasksColor Label Description Reviewing Pump StatusLogging On and Logging Off Enabling and Disabling Stations and Pumps Enter the alphanumeric passwordReaching and Reading the Station Operator Screens Reviewing and Adjusting Basic Station SettingsNavigating among the Station Operator Screens Activating and Stopping Priority Convey for a Station Adjusting Convey Time and Dump DelayChanging the Mixture for a Remote Proportioning Valve Advanced Tasks Reviewing and Resetting a Pump Hour MeterTransferring Stations to a Standby Pump Page Page Reviewing Alarms AlarmsSilencing Alarms Preventative Maintenance MaintenanceCorrective Maintenance Network Scanner Module ConsiderationsOptions for Station Setup Configurable SettingsMemory Module Considerations Name Description Options Default Conveying Options Option Input Pump, 128-Station Controller Configurable Settings Pump, 128-Station Controller Configurable Settings Options for Pump Setup Pump, 128-Station Controller Configurable Settings General Troubleshooting TroubleshootingAlarm message Possible cause Station AlarmsPump, 128-Station Controller Troubleshooting System Alarms Pump AlarmsAppendix WarrantyOptional Components 24-Pump, 128-Station Controller with 10 Display Drawings and DiagramsTypical System Installation Layout Spare Parts ListReturned Material Policy Warranty ReturnsCredit Returns Controller Safety Tags Safety Tag InformationController Identification Serial Number Tag Technical Assistance Contact Information Service DepartmentParts Department Sales Department