Hold a station icon to go to its Station Operator screen, then touch Setup to go to the Station n Setup screen. Use ◄ Back. and Next ► to review all pump assignments and, where necessary, choose Assigned to Pump x to set station assignments to 0 (unassigned). Then return to the Transfer to Standby Pump screen.
1.Touch Transfer To Standby Pump.
“Transfer in Progress” appears briefly on the screen, followed by “Transfer Complete,” in place of the Transfer To Standby Pump button. The controller switches the setting for Source Pump to the new pump and switches the setting for Standby Pump to 0 (unassigned).
2.Touch Return.
The Pump n Setup screen appears.
3.Touch Pumps.
The Pump Summary screen appears.
4.Put the standby pump online by briefly touching its icon.
The icon changes color to show the new status, and the system begins using the pump. In addition, all Station n Operator and Setup screens show the new pump assignment.
When the failed pump is operational again, you can repeat this process, this time using the standby pump’s number as the setting for Source Pump the repaired pump’s number as the setting for Standby Pump.