Sterling Plumbing 882.00254.00 specifications Parts and Service Department

Page 2

Please note that our address and phone information has changed. Please reference this page for updated contact information.

These manuals are obsolete and are provided only for their technical information, data and capacities. Portions of these manuals detailing procedures or precautions in the operation, inspection, maintenance and repair of the products may be inadequate, inaccurate, and/or incomplete and shouldn’t be relied upon. Please contact the ACS Group for more current information about these manuals and their warnings and precautions.

Parts and Service Department

The ACS Customer Service Group will provide your company with genuine OEM quality parts manufactured to engineering design specifications, which will maximize your equipment’s performance and efficiency. To assist in expediting your phone or fax order, please have the model and serial number of your unit when you contact us. A customer replacement parts list is included in this manual for your convenience. ACS welcomes inquiries on all your parts needs and is dedicated to providing excellent customer service.

For immediate assistance, please contact:

North, Central and South America, 8am – 5pm CST +1 (800) 483-3919 for drying, conveying, heating and cooling and automation. For size reduction: +1 (800) 229-2919.

North America, emergencies after 5pm CST (847) 439-5855

North America email: acsuscanadacustserv@corpemail.com

Mexico, Central & South America

Email: acslatinamericacustserv@corpemail.com

Europe, Middle East & Africa +48 22 390 9720

Email: acseuropecustserv@corpemail.com

India +91 21 35329112

Email: acsindiacustserv@corpemail.com

Asia/Australia +86 512 8717 1919

Email: acsasiacustserv@corpemail.com

Sales and Contracting Department

Our products are sold by a worldwide network of independent sales representatives. Contact our Sales Department for the name of the sales representative nearest you.

Let us install your system. The Contract Department offers any or all of these services: project planning; system packages including drawings; equipment, labor, and construction materials; and union or non-union installations.

For assistance with your sales or system contracting needs please Call:

North, Central and South America +1 (262) 641-8600 or +1 (847) 273-7700 Monday–Friday, 8am–5pm CST

Europe/Middle East/Africa +48 22 390 9720

India +91 21 35329112

Asia/Australia +86 512 8717 1919

Facilities:

ACS offers facilities around the world to service you no matter where you are located. For more information, please visit us at www.acscorporate.com

United States:

Asia/Australia:

India

 

 

 

ACS Suzhou

ACS India

ACS Schaumburg – Corporate Offices

Gat No. 191/1, Sandbhor Complex

1100 E. Woodfield Road

109 Xingpu Road SIP

Mhalunge, Chakan, Tal Khed,

Suite 588

 

 

Suzhou, China 215126

Dist. Pune 410501, India

Schaumburg, IL 60173

Phone: + 86 8717 1919

Phone: +91 21 35329112

Phone: + 1 847 273 7700

Fax: +86 512 8717 1916

Fax: + 91 20 40147576

Fax: + 1 847 273 7804

Europe/Middle East/Africa:

 

 

 

 

 

ACS New Berlin – Manufacturing Facility

ACS Warsaw

 

2900 S. 160

th

Street

 

 

Ul. Działkowa 115

 

New Berlin, WI 53151

 

Phone : +1 262 641 8600

02-234 Warszawa

Phone: + 48 22 390 9720

Fax: + 1 262 641 8653

Fax: +48 22 390 9724

 

Image 2
Contents SCC 7-Pump 50D & D Plus-Station Controllers Parts and Service Department Shipping Information Table of Contents Maintenance Controller Safety Tags Safety Symbols Used in this Manual SafetyHow to Use This Manual Wear Safety Glasses and Work Gloves Responsibility General ResponsibilityOperator Responsibility Maintenance ResponsibilityReporting a Safety Defect General Description Functional DescriptionModels Covered in This Manual Electrical Features Standard FeaturesMechanical Features Controller FeaturesSafety Circuit Standards Optional FeaturesSafety Devices and Interlocks Fail Safe OperationSafety Device Lock-Outs Uncrating InstallationSystem Installation Overview Mounting the Control PanelRunning KwikLink Cables Making Control Panel Power Drop Wiring ConnectionsElectrical Connections About KwikLink Flat CablesInstalling KwikLink Cable Installing Assembled Mounting Plates Setting Up and Installing Mounting PlatesSetting Up Mounting Plates Terminating Cable Runs Discard the standard resistor cap to eliminate confusionInstalling Inside KwikLink Connectors with Blank Caps Proper Termination ConnectionsAddressing Armorblocks Addressing and Installing ArmorBlocksSetting Armorblock Addresses ArmorBlock Address RangesInstalling ArmorBlocks Using seal block to pierce cableSecuring the Seal Block to the Cable Base Installing KwikLink Connectors Connecting the Controller to the Network Connecting the Remote Interface to the Main ControllerProper Controller and Remote Interface Connections Connecting the Power Supply Enclosure to the Network Proper Power Supply Enclosure Connections Connecting Vacuum Receivers to the Network 50D 4-Connector ArmorBlock ConnectionsPlus Connections Connecting Vacuum Pumps and Filter Chambers to the Network Connecting Vacuum PumpsProper Vacuum Pump Connections Connecting Filter Chambers Proper Filter Chamber ConnectionsConnecting Central Alarms to the Network Proper Central Alarm ConnectionsAlarm Horn C-O1 Setup Basic Menu Flow for SetupSetting Up the System Setting the Number of Stations and the Number of Pumps50D Plus Screen shown Checking Addressing and Wiring for System Components Page Page Setting Up Alarm Silences Setting Up Pump Staging Setting Up Touch Switch DelaySetting Up Stations Setting Up a Single Station50D Plus shown Copying Settings from One Station to Others To copy the selected station’s settings to one other station Setting Up Pumps Setting Up a Single PumpPage Copying Settings from One Pump to Others To copy the selected pump’s settings to one other pumpTo copy the current pump’s settings to all other pumps Finishing Setup Setting Up Passwords Page Initial Startup Starting and Stopping the System OperationOverview Basic Tasks Reviewing Station StatusColor Label Description Reviewing Pump Status Color Label Description Logging On and Logging Off Enabling and Disabling Stations and Pumps Reviewing and Adjusting Basic Station Settings Reaching and Reading the Station Operator ScreensAdjusting Convey Time and Dump Delay Navigating among the Station Operator ScreensActivating and Stopping Priority Convey for a Station Changing the Mixture for a Remote Proportioning ValveAdvanced Tasks Changing the Line with Material ProofingReviewing and Resetting a Pump Hour Meter Transferring Stations to a Standby Pump Page Page Alarms Reviewing AlarmsClearing the Alarm Log Touch ContinueSilencing Alarms Corrective Maintenance MaintenancePreventative Maintenance Network Scanner Module ConsiderationsMemory Module Considerations Configurable SettingsOptions for Station Setup 50D Plus or 7/50D Controller Configurable Settings Blow Back Options Only available on 7/50D Plus systems Only available on 7/50D Plus systems 50D Plus or 7/50D Controller Configurable Settings Options for Pump Setup 50D Plus or 7/50D Controller Configurable Settings Troubleshooting General TroubleshootingStation Alarms Alarm message Possible causePump Alarms System Alarms Optional Components WarrantyAppendix Drawings and Diagrams Pump 50 station Controller with ??? DisplayTypical System Installation Layout 50D Plus or 7/50D Controller Appendix AC Voltage Spare Parts ListReturned Material Policy DC VoltageController Safety Tags Safety Tag InformationWarranty Returns Controller Identification Serial Number TagParts Department Service DepartmentTechnical Assistance Contact Information Sales Department