6-3 Options for Pump Setup

Several of the items in this screen are not setup options but are instead intended for use during operation. These items (hour meter and transferring stations to a standby pump) are described in Chapter 4, “Operation.”

Name

Description

Options

Default

Idle Time Options

 

 

 

Auto shutdown delay

Length of time the pump continues to run

0–999 sec.

45 sec.

 

unloaded without demand from any station.

 

 

 

After this time has elapsed, the pump shuts

 

 

 

down to save power and to prevent wear on the

 

 

 

pump.

 

 

 

Adjust this setting to fit the needs of your facility

 

 

 

in trading off the savings against the costs

 

 

 

associated with waiting for a pump to start up

 

 

 

when there is a demand for material.

 

 

Alarm Options

 

 

 

Local alarm

When this option is enabled, the controller turns

disabled,

disabled

 

on the local alarm light for any alarm at this

enabled

 

 

specific pump.

 

 

 

Enable this option if and only if your facility has

 

 

 

installed a local alarm light for this pump.

 

 

Pump fault #1

The ArmorBlock for each pump has two inputs

disabled,

disabled

 

that you can wire to generate alarms for

enabled

 

 

situations of your choosing. For example, you

 

 

 

may have a sensor that turns on when material

 

 

 

reaches the top of a filter-chamber waste bin.

 

 

 

When this option is enabled, the controller

 

 

 

issues an alarm if the sensor wired to the input

 

 

 

for Pump Fault #1 turns on.

 

 

 

Enable this option if and only if your facility has

 

 

 

installed a miscellaneous alarm on the input for

 

 

 

Pump Fault #1 for this pump.

 

 

Pump fault #2

See the explanation for Pump fault #1 above.

disabled,

disabled

 

Enable this option if and only if your facility has

enabled

 

 

installed a miscellaneous alarm on the input for

 

 

 

Pump Fault #2 for this pump.

 

 

Blow Back Options

 

 

 

Blow back

When this option is enabled, the controller

disabled,

disabled

 

periodically sends compressed air backward

enabled

 

 

through the pump’s air filter to dislodge

 

 

 

accumulated dust and debris.

 

 

 

Enable this option if and only if the pump has

 

 

 

the equipment for compressed-air filter cleaning.

 

 

Every n loads

Number of conveying cycles to stations between

1–99

5

 

filter cleanings.

 

 

 

Adjust this setting based on experience. The

 

 

 

more dust and debris in your material line, the

 

 

 

smaller this number needs to be.

 

 

# pulses

Number of pulses of compressed air sent

1–99

5

 

through the pump’s filter during cleaning.

 

 

 

If blow-back is not working as desired, the

 

 

 

service department may ask you to change this

 

 

 

setting.

 

 

7/50D Plus or 7/50D Controller

Chapter 6: Configurable Settings

78

Image 79
Contents SCC 7-Pump 50D & D Plus-Station Controllers Parts and Service Department Shipping Information Table of Contents Maintenance Controller Safety Tags How to Use This Manual SafetySafety Symbols Used in this Manual Wear Safety Glasses and Work Gloves General Responsibility ResponsibilityReporting a Safety Defect Maintenance ResponsibilityOperator Responsibility Models Covered in This Manual Functional DescriptionGeneral Description Controller Features Standard FeaturesMechanical Features Electrical FeaturesFail Safe Operation Optional FeaturesSafety Devices and Interlocks Safety Circuit StandardsSafety Device Lock-Outs Mounting the Control Panel InstallationSystem Installation Overview UncratingAbout KwikLink Flat Cables Making Control Panel Power Drop Wiring ConnectionsElectrical Connections Running KwikLink CablesInstalling KwikLink Cable Setting Up Mounting Plates Setting Up and Installing Mounting PlatesInstalling Assembled Mounting Plates Discard the standard resistor cap to eliminate confusion Terminating Cable RunsProper Termination Connections Installing Inside KwikLink Connectors with Blank CapsArmorBlock Address Ranges Addressing and Installing ArmorBlocksSetting Armorblock Addresses Addressing ArmorblocksUsing seal block to pierce cable Installing ArmorBlocksSecuring the Seal Block to the Cable Base Installing KwikLink Connectors Connecting the Remote Interface to the Main Controller Connecting the Controller to the NetworkProper Controller and Remote Interface Connections Connecting the Power Supply Enclosure to the Network Proper Power Supply Enclosure Connections 50D 4-Connector ArmorBlock Connections Connecting Vacuum Receivers to the NetworkPlus Connections Connecting Vacuum Pumps Connecting Vacuum Pumps and Filter Chambers to the NetworkProper Vacuum Pump Connections Proper Filter Chamber Connections Connecting Filter ChambersProper Central Alarm Connections Connecting Central Alarms to the NetworkAlarm Horn C-O1 Basic Menu Flow for Setup SetupSetting the Number of Stations and the Number of Pumps Setting Up the System50D Plus Screen shown Checking Addressing and Wiring for System Components Page Page Setting Up Alarm Silences Setting Up Touch Switch Delay Setting Up Pump StagingSetting Up a Single Station Setting Up Stations50D Plus shown Copying Settings from One Station to Others To copy the selected station’s settings to one other station Setting Up a Single Pump Setting Up PumpsPage To copy the selected pump’s settings to one other pump Copying Settings from One Pump to OthersTo copy the current pump’s settings to all other pumps Finishing Setup Setting Up Passwords Page Initial Startup Overview OperationStarting and Stopping the System Reviewing Station Status Basic TasksColor Label Description Reviewing Pump Status Color Label Description Logging On and Logging Off Enabling and Disabling Stations and Pumps Reaching and Reading the Station Operator Screens Reviewing and Adjusting Basic Station SettingsNavigating among the Station Operator Screens Adjusting Convey Time and Dump DelayChanging the Mixture for a Remote Proportioning Valve Activating and Stopping Priority Convey for a StationChanging the Line with Material Proofing Advanced TasksReviewing and Resetting a Pump Hour Meter Transferring Stations to a Standby Pump Page Page Reviewing Alarms AlarmsTouch Continue Clearing the Alarm LogSilencing Alarms Network Scanner Module Considerations MaintenancePreventative Maintenance Corrective MaintenanceOptions for Station Setup Configurable SettingsMemory Module Considerations 50D Plus or 7/50D Controller Configurable Settings Blow Back Options Only available on 7/50D Plus systems Only available on 7/50D Plus systems 50D Plus or 7/50D Controller Configurable Settings Options for Pump Setup 50D Plus or 7/50D Controller Configurable Settings General Troubleshooting TroubleshootingAlarm message Possible cause Station AlarmsPump Alarms System Alarms Appendix WarrantyOptional Components Pump 50 station Controller with ??? Display Drawings and DiagramsTypical System Installation Layout 50D Plus or 7/50D Controller Appendix DC Voltage Spare Parts ListReturned Material Policy AC VoltageController Identification Serial Number Tag Safety Tag InformationWarranty Returns Controller Safety TagsSales Department Service DepartmentTechnical Assistance Contact Information Parts Department