GSI Outdoors PNEG-377 service manual Fenwal-Series

Page 93

Fan and Heater

FENWAL-SERIES 05-14

Figure 2

Figure 3

93

Image 93
Contents Service Manual Page Table of Contents Safety Alert Symbol Roof WARNING, Operation & SafetyRoof Damage Warning and Disclaimer Proper Use of ProductSafety Power WarningFuel Warning Page Vane Axial Fans Previously Installed Units FAN InstallationProper Installation of the Ground Rod Machine to Earth GroundTest Station RPM Vane Axial Fan FAN SpecificationsFAN Fan Troubleshooting Chart FAN TroubleshootingTroubleshooting Fan Control CircuitPush Start Button, Nothing Happens Volt 1 Phase 15 HP FAN Wiring and SchematicLubricant FAN ServiceMotors with Regreasing Grease in motor bearings84 ft. lbs. Trantorque Hub Bolt Torque Requirement for Fan Blades14 1HP 18-1.5HPCentrifugal FAN Service Guide RPM FAN RPM FAN Specifications 150 200 100 FAN Schematic and Wiring Volt 1 Phase 15 HP MarathonSchematic Wiring Diagram Procedure LubricationRelubrication Intervals 29ft. lbs. Browning 15HP 3500RPM fans 16ft. lbs. BrowningGas Heater Service Guide Heater Installation Bin ConfigurationOperating Temperature Table Replacing HF-7100 Board with HF-7318 Disconnectand LOCK-OUT Power Before Servicing HeaterLow Temperature Heater Specifications High Temperature Heater SpecificationsBTUs per Gauge Pressure PSI Propane Models Approximate Vane Axial GAS Heater SpecificationsBTUs Gauge Pressure PSI Natural Gas Models Approximate Low & Medium Temperature Models CHI-TOWN GAS Heater SpecificationsHigh Temperature CHI-TOWN Heater SpecificationsBtus Per Gauge Pressure Psi Natural Gas Models Approximate MED TemperatureCentrifugal Heater Specifications Downwind Heater SpecificationsTransition Hi-limit Installation Air Pressure Switch Temperature Sensor Box InstallationSecondary Heater Unit Heater Unit WiringFigure a Installing Optional Humidity SensorPower Up Operating ProcedureNormal Operating Displays With Heater Not Running Starting The Dryer Setting Gas PressureOperating Procedure Adjusting the Air Pressure Switch AIR Pressure SwitchRunning The Dryer Adjusting The VaporizorProgramming Set Points Programming Hours To Shutdown Drying Grain Hours To Shutdown ModeRun Hours Display Multiple Heater NotesAmount of gas used by the heater Modulating Valve OperationFactory Configuration Configuration Dip Switches Normally DoneAt GSI Limit Switches Error ConditionsMultiple Heater Error Conditions Misc Error NumbersHeater Service Wiring Diagram Programing Instructions for Series 2000 Heater Turn Control Power on dryer to the off positionProgrammer Hook Up +18%Heater Electrical Installation Heater Electrical Installation 230V FansConnect power cord to fan control box Mount the housing to the bin Sidewall to seal Transition HI-LIMIT InstallationPlenum Thermostat Mounting To the right sideAnnual Heater Inspection Installation For Standard Units For Units Using HF-7318 Control BoardRun 2 wires 18 gage between master and slave unit FAN PartsWiring Schematic Standard Heater Wiring Standard Heater Schematic Housing TROUBLE-SHOOTING Flow Chart7528% 352%$%/&$86 Trouble Shooting ChartFan and Heater Gas Heaters Deluxe Heater Wiring Deluxe Heater Schematic Heaters 2ND Heater Installation Installation Standard UnitsInstallation HI-LO Units Smart Board Standard Heaters not HI-LO fireHI-LO Fire Heater Troubleshooting Chart Light IdentificationDescription For Heaters Manufactured after Fan And Heater Downwind Heat Adjustment ProcedureGAS Heaters 2ND Heater Installation Wiring Schematic GAS Heaters Purge Delay Electrical CHECK-OUT ChartTime Delay Reset Flame Probe2ND Heater Installation PRE-1990 GAS Heaters Heater Wiring Diagram Vane Axial LP Heater Heater SchematicVane Axial Vapor Heater Downwind LP Heater Downwind Vapor Heater Lo-Fire Downwind Heater Miscellaneous Information Flame Detector KIT Installation 1991-1993PNEG-286 Flame Detector Kit InstallationPart Number HF-7136 1994-1995PNEG-286 Flame Detector Kit Installation PRESENTPNEG-286 SELF-OPERATED Modulating Valves InstallationApplication OperationOrifice Sizes in Kit Number PLG14A-600R Bypass Orifice SelectionCheckout Procedure AdjustmentRepairs and Replacement Replacement PartsManual Reset Installation InstructionsFENWAL-SERIES SeriesFlame Sensing SpecificationsElectrode Application Control Board CommentsSystem Checks Fan and Heater Control BoardPolarity Check Initial OperationFENWAL-SERIES Repair and Replacements Safety ChecksWARRANTY/SERVICE Notes Limited Warranty StatementTwisto Says Motor Capacitor Chart Page 1004 E. Illinois St Assumption, IL Phone Fax February