GSI Outdoors PNEG-377 service manual FAN Parts, For Units Using HF-7318 Control Board

Page 55

Fan and Heater

FAN PARTS

 

 

For Units Using

HF-7318 Control Board

2 Deluxe heaters may be connected to one grain drying system and wired so they cycle together. One of the heaters should have a thermostat connected to it as per the installation instructions. That heater will be referred to as the master. The other heater (without the thermostat) will be referred to as the slave.

Installation For

Standard Units

1.Install relay base (TD-100283) in master heater control box.

2.Connect wire between term 6 on circuit board and terminals 14 on relay base in master heater.

3.Connect wire between term 13 on relay base and terminals 8 on circuit board in master heater.

4.Run 2 wires (18 gage) between master and slave heaters.

5.Connect wires to terminal 5 and 9 (points A and B) on relay base in master heater.

6.Connect wire from terminal 9 in master to terminal 14 (point F) in slave unit.

7.Connect wire from terminal 5 in master to terminal 15 (point E) in slae unit.

8.Install relay (TD-100282) in relay base.

Additional Steps For

Hi-Lo Units

1.Run 2 wires (18 gage) between master and slave unit.

2.Connect wires to terminals 21 and 22 (points C and D) on circuit board in main heater.

3.Connect wire from terminal 21 in master to terminal 12 (point H) in slave unit.

4.Connect wire from terminal 22 in master to terminal 13 (point G) in slave unit.

5.Install relay (TD-100282) in relay base.

Figure 4: The HF-7318 control board.

55

Image 55
Contents Service Manual Page Table of Contents Proper Use of Product Roof WARNING, Operation & SafetySafety Alert Symbol Roof Damage Warning and DisclaimerPower Warning SafetyFuel Warning Page Vane Axial Fans Machine to Earth Ground FAN InstallationPreviously Installed Units Proper Installation of the Ground RodTest Station RPM Vane Axial Fan FAN SpecificationsFAN Fan Troubleshooting Chart FAN TroubleshootingFan Control Circuit TroubleshootingPush Start Button, Nothing Happens Volt 1 Phase 15 HP FAN Wiring and SchematicGrease in motor bearings FAN ServiceLubricant Motors with Regreasing18-1.5HP Hub Bolt Torque Requirement for Fan Blades84 ft. lbs. Trantorque 14 1HPCentrifugal FAN Service Guide RPM FAN RPM FAN Specifications 150 200 100 Volt 1 Phase 15 HP Marathon FAN Schematic and WiringSchematic Wiring Diagram Lubrication ProcedureRelubrication Intervals 29ft. lbs. Browning 15HP 3500RPM fans 16ft. lbs. BrowningGas Heater Service Guide Bin Configuration Heater InstallationOperating Temperature Table Replacing HF-7100 Board with HF-7318 Disconnectand LOCK-OUT Power Before Servicing HeaterLow Temperature Heater Specifications High Temperature Heater SpecificationsBTUs per Gauge Pressure PSI Propane Models Approximate Vane Axial GAS Heater SpecificationsBTUs Gauge Pressure PSI Natural Gas Models Approximate Low & Medium Temperature Models CHI-TOWN GAS Heater SpecificationsHigh Temperature CHI-TOWN Heater SpecificationsBtus Per Gauge Pressure Psi Natural Gas Models Approximate MED TemperatureCentrifugal Heater Specifications Downwind Heater SpecificationsTransition Hi-limit Installation Air Pressure Switch Temperature Sensor Box InstallationSecondary Heater Unit Heater Unit WiringFigure a Installing Optional Humidity SensorPower Up Operating ProcedureNormal Operating Displays With Heater Not Running Starting The Dryer Setting Gas PressureOperating Procedure Adjusting the Air Pressure Switch AIR Pressure SwitchRunning The Dryer Adjusting The VaporizorProgramming Set Points Multiple Heater Notes Drying Grain Hours To Shutdown ModeProgramming Hours To Shutdown Run Hours DisplayAmount of gas used by the heater Modulating Valve OperationConfiguration Dip Switches Normally Done Factory ConfigurationAt GSI Misc Error Numbers Error ConditionsLimit Switches Multiple Heater Error ConditionsHeater Service Wiring Diagram Programing Instructions for Series 2000 Heater Turn Control Power on dryer to the off positionProgrammer Hook Up +18%Heater Electrical Installation 230V Fans Heater Electrical InstallationConnect power cord to fan control box To the right side Transition HI-LIMIT InstallationMount the housing to the bin Sidewall to seal Plenum Thermostat MountingAnnual Heater Inspection FAN Parts For Units Using HF-7318 Control BoardInstallation For Standard Units Run 2 wires 18 gage between master and slave unitWiring Schematic Standard Heater Wiring Standard Heater Schematic Housing TROUBLE-SHOOTING Flow Chart7528% 352%$%/&$86 Trouble Shooting ChartFan and Heater Gas Heaters Deluxe Heater Wiring Deluxe Heater Schematic Heaters Installation Standard Units 2ND Heater InstallationInstallation HI-LO Units Standard Heaters not HI-LO fire Smart BoardHI-LO Fire Heater Light Identification Troubleshooting ChartDescription For Heaters Manufactured after Fan And Heater Downwind Heat Adjustment ProcedureGAS Heaters 2ND Heater Installation Wiring Schematic GAS Heaters Flame Probe Electrical CHECK-OUT ChartPurge Delay Time Delay Reset2ND Heater Installation PRE-1990 GAS Heaters Heater Wiring Diagram Vane Axial LP Heater Heater SchematicVane Axial Vapor Heater Downwind LP Heater Downwind Vapor Heater Lo-Fire Downwind Heater Miscellaneous Information 1991-1993PNEG-286 Flame Detector Kit Installation Flame Detector KIT InstallationPart Number HF-7136 1994-1995PNEG-286 Flame Detector Kit Installation PRESENTPNEG-286 Operation InstallationSELF-OPERATED Modulating Valves ApplicationOrifice Sizes in Kit Number PLG14A-600R Bypass Orifice SelectionReplacement Parts AdjustmentCheckout Procedure Repairs and ReplacementSeries Installation InstructionsManual Reset FENWAL-SERIESControl Board Comments SpecificationsFlame Sensing Electrode ApplicationInitial Operation Fan and Heater Control BoardSystem Checks Polarity CheckFENWAL-SERIES Repair and Replacements Safety ChecksLimited Warranty Statement WARRANTY/SERVICE NotesTwisto Says Motor Capacitor Chart Page 1004 E. Illinois St Assumption, IL Phone Fax February