Burnham IN10 manual Boiler Flueway Cleaning, Clean Boiler Flueways

Page 63

Figure 58: Boiler Flueway Cleaning

i. Inspect connecting lines to boiler for accumulation of mud and scale. Clean as necessary.

ii. Examine wiring for brittle or worn insulation and clean electrical contact.

iii. Inspect solder joints on bellows and float. Check float for evidence of collapse. Check mercury bulb (where applicable) for mercury separation or discoloration. Do not attempt to repair mechanisms in field. Complete replacement mechanisms, including gaskets and instructions, are available from low water cutoff manufacturer.

c.Five (5) Years or 100,000 switch cycles. Replace switch and float mechanisms.

C.Water Feeder and Additional Low Water Cutoff. Refer to manufacturer's instructions.

D.Vent System. Check annually for:

1.obstructions

2.accumulations of soot

3.deterioration of vent pipe or vent accessories due to condensation or other reasons

4.proper support—no sags, particularly in horizontal runs

5.tightness of joints. Remove all accumulations of soot with wire brush and vacuum

Remove all obstructions. Replace all deteriorated parts and support properly. Seal all joints.

E.Clean Boiler Flueways.

1.Shut down gas boiler in accordance with lighting/ operating instructions attached to inside of Front Removable Door. See Figure 45.

2.Remove Burner Access Panel and Burners. See Paragraph F. Clean Burners if necessary.

3.Remove Jacket Top Panels.

4.Remove Canopy from top of boiler.

5.Thoroughly clean the flueways with flue brush. See

Figure 58.

6.Clean boiler heating surface accessible from combustion chamber with straight handle wire brush. Reinstall burners and connect gas train. See Paragraphs F & G.

7.Place boiler in operation in accordance with Lighting or Operating instructions. Test gas line for leaks in accordance with Section VI: Gas Piping, Paragraph C.

8.Replace Jacket Front Removable Door.

63

Image 63
Contents 8141049R26-10/08 Price $5.00 IndependencePage Page Dimensional Drawing Table of Contents Probe L.W.C.O Float L.W.C.O Tankless Heater Pre-Installation Clearance to Combustible Materials II. Knocked-Down Boiler Assembly Install Base-Burner-Manifold AssemblyInstall assembled cast iron sections on base assembly Canopy Gasket Installation Install CanopyCombustion Chamber Intermittent Ignition EI Install Ignition Module Install Blocked Vent Switch with sheet metal screwsSteam Boiler with Probe Low Water Cutoff III. Semi-Pak Boiler AssemblyInstall Trim and Controls Remove CrateWater Boiler Junction Box and Mounting Bracket AssemblyIV. Packaged Boiler Assembly Install Jacket Front PanelRemove Jacket Front Panel. See Figure Piping and Trim Page Recommended Water Piping for Circulator Zoned Heating System Recommended Water Piping for Zone Valve Zoned Heating System Recommended Piping for Indirect Water Heater Page VI. Gas Piping Rated InputConnect boiler gas valve to gas supply system Specific Gravity Correction Factors for Natural Gas Fitting Equivalent LengthsBoiler Equipped With Vent Damper VII. VentingIf an Existing Boiler is Removed Typical Vent InstallationVIII. Electrical Wire Vent Damper if usedAlliance Indirect Water Heater if used Thermostat Heat Anticipator SettingsVent Damper Harness to Limit This page Left Intentionally Blank Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Page Follow Lighting or Operating Instructions IX. System Start-upFill boiler with water Prepare to check operationPage Page Page Page Ignition Module Terminal Cross-Reference Ignition Module Wiring Ladder Diagram Terminal DesignationOFF Green LED Status CodesPilot Burner Flame, Honeywell Q350 Check Limit Adjust gas input rate to boiler. Natural GasCheck low water cutoff steam only Do not drain below gauge glassInput Rate Adjust gas input rate to boiler. LP/PropanePage Page Maintenance of Low Water Cutoff Service InstructionsClean Boiler Flueways Boiler Flueway CleaningTankless Heater Pilot Burner LocationModel No Gallons Per Month Year Excessive Make-Up WaterHoneywell Electronic Ignition Trouble Shooting Guide Honeywell Hot Surface to Pilot Trouble Shooting Guide Avoid Breathing Fiber Particulates and Dust Service Record XI. Repair PartsSection Assembly Canopy and Draft Hood Canopy/Draft Hood Parts Base Tray Base AssemblyBurner Tray 1 Inch Main Burners Manifold and 1 Main Burners Manifold and Main Burners 1 Inch Main Burners Only Volt Continuous Ignition Standing Pilot Natural Gas Manifold and 40mm Main BurnersManifold and Main Burners 40MM Main Burners only Intermittent Ignition OnlyNatural Gas, High Altitude 2000-4500 Ft. Canada Only LP Gas, High Altitude 2000-5000 Ft. USA OnlyNatural Gas, High Altitude 5000-9000 Ft. USA Only LP Gas, High Altitude 5000-9000 Ft. USA OnlyPilot Burner, Honeywell Q350A1321 Pilot Burner, Honeywell Q348A1002 Page Jacket Assembly Front Top Panel Jacket Assembly Refer to Figure onSteam Trim Page Water Trim Quantity This page Left Blank Intentionally Page Ignition Module Intermittent Ignition Only Flame Rollout SwitchBlocked Vent Switch Transformer Steam and Gravity Water OnlyWiring of Typical Lwco XII. Low Water Cut Off LwcoLwco Location Limited Warranty Limited Warranty