Hearth and Home Technologies TRUE-36, TRUE-42, TRUE-50 Appliance Preparation, Vent Preparation

Page 37

9 Appliance Preparation

A. Vent Preparation

CAUTION! Risk of Cuts, Abrasions or Flying Debris.

Wear protective gloves and safety glasses during instal- lation. Sheet metal edges are sharp.

NOTICE: This appliance is top vented ONLY.

1.Remove shrink wrap from appliance. Figure 9.1 shows the shipping location of the seal cap and heat shields (Section 9), splatter guard and finishing templates (Section 13), and the logs and Teco-Sil (Section 14).

2.Remove seal cap from top of appliance by removing one screw, which is included, to prevent construction material from getting into appliance. Remove seal cap when pipe installation phase begins. See Figure 9.2.

3.Ensure gasket seal is in place prior to installing vent pipe sections. Gasket is installed at the factory.

SEAL CAP

GASKET

Figure 9.2 Seal Cap and Gasket Location

LOGS

SEAL CAP

FINISHING

TEMPLATES

SPLATTER GUARD

TECO-SIL

HEAT SHIELDS

Figure 9.1 Shipping Location of Components

Heat & Glo • TRUE-36, TRUE-42, TRUE-502282-900 Rev. D • 8/12

37

Image 37
Contents What to do if you smell gas ModelsDo Discardnot HOT SurfacesHomeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupReference Materials Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyIPI Battery Tray/Battery Installation Clear SpaceNine Hour Safety Shutdown Feature Module ResetControl Module Operation Before Lighting FireplaceFinal inspection by Lighting Instructions IPIWhat to do if YOU Smell GAS GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Glass Cleaning Exterior and Interior of Installed Glass Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection D ReplacementIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Any such action may cause a fire hazardSelecting Appliance Location Framing and ClearancesTRUE-36 TRUE-42Constructing the Appliance Chase Minimum Framing DimensionsClearances Non-Combustible Zone Mantel and Wall ProjectionsCombustible Mantel Legs or Wall Projections Non-Combustible Mantel Legs or Wall ProjectionsCombustible Mantel Projections 21 MINNON-COMBUSTIBLE Material TRUE-50Model Hearth ExtensionVent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Ft. Canada ..........not to be installed above a gas meterVent Information and Diagrams TRUE-36 NG/LP, TRUE-42 NG Top Vent Horizontal Termination One ElbowTRUE-50 NG/LP V1 Minimum Maximum+ H Two ElbowsTRUE-36 NG/LP, TRUE-42 NG/LP MinimumTRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LP Top Vent Horizontal Termination Three ElbowsFlue Restrictor Elbows Top Vent Vertical TerminationTRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LP Ht Max Top Vent Vertical Termination Three ElbowsPVI-SLP PVK-80 and PVI-SLP Information Pipe Clearances to Combustibles Vent Clearances and Framing Wall Penetration Framing Non-Combustible Wall PenetrationPipe DVP Install the Ceiling FirestopInstalling the Optional Heat-ZoneGas Kit Install Attic Insulation ShieldFlat Ceiling Installation Vaulted Ceiling InstallationVent Preparation Appliance PreparationSide Nailing Tab in Shipping Position Securing and Leveling the ApplianceInstalling Non-Combustible Facing Material Installing Non-combustible Facing MaterialAttach Vent to the Firebox Assembly Installing Vent Pipe DVP PipeAssemble Vent Sections Assemble Pipe SectionsDisassemble Vent Sections Secure the Vent SectionsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Horizontal Termination Cap Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntelliFire PlusTM Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationAccess Through Left Column Access Through Firebox Electrical Service and Repair Junction Box InstallationFinishing Template installation instructionFinishing Templates Finishing Templates Bends Inoperable Fixed Doors Splatter GuardFACTORY-SUPPLIED NON-COMBUSTIBLE Combustible or Board 10 Combustible Mantel Allowance TRUE-36, TRUE-42 MAX 21 MINFacing Material 14 Non-combustible Facing DiagramDoors Dimension Inoperable Operable DoorArch Operable DoorsAppliance Setup LED’s Glowing Ember PlacementModels TRUE-36C, TRUE-36H, TRUE-36S Install the Log Assembly Log Set Assembly LOGS-TRUE36LOG Contacts Side Grate Tine Notch forLOG Contacts Left Grate Tine TineLOG Contacts Grate Tine LOG #7 TRUE-42 only Back Tine LOG Contacts Refractory Notch Front TineLOG #4 LOG Placement Slots NotchFlat Area Notch for For LOG #3TOP of Burned Area Near LOG #1 LOG Resting in Notch LOG Contacts 8 Grate Tine Back Tine Front Tine LOG Contacts Refractory NotchTRUE-36 TRUE-42 TRUE-50 TOP Retaining Rail Notch Glass Frame Notch Model TRUE-36 Air Shutter SettingTRUE-42 TRUE-50Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Appliance Dimensions TRUE-42 & TRUE-50 DVP-AS2 Vent Components DiagramsDVP-TRAP DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2Horizontal Termination Cap BEK DVP-BEK2 RF6M RF12MDVP-TRAPFL COOL-ADDPower Vent Inline Optional Wire HarnessDescription Part Number SLP-LPCCService. ServicePartsParts Log Set AssemblyAt Depot Description Comments Part NumberStocked Service PartsDescription Comments Part Number Log Set Assembly TRUE-42S, TRUE-42H, TRUE-42C LOGS-TRUE50 TRUE-50S, TRUE-50H, TRUE-50C TRUE-36, TRUE-42, TRUE-50 #13 Valve AssemblyMYSTIC-EMBERS Contact Information