Hearth and Home Technologies TRUE-42, TRUE-36, TRUE-50 owner manual Install Metal Roof Flashing

Page 42

D. Install Metal Roof Flashing

See minimum vent heights for various pitched roofs (Figure 10.9) to determine the length of pipe to extend through the roof.

Slide the roof flashing over the pipe sections extending through the roof as shown in Figure 10.10.

 

 

HORIZONTAL

 

 

OVERHANG

2 FT.

20 INCHES MIN.

VERTICAL

MIN.

 

 

WALL

 

LOWEST

 

 

 

DISCHARGE

 

 

OPENING

 

GAS DIRECT VENT

 

 

TERMINATION CAP

 

 

 

 

X

 

 

12

 

 

ROOF PITCH

 

 

IS X/ 12

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

TO LOWEST DISCHARGE OPENING

Roof Pitch

 

H (Min.) Ft.

Flat to 6/12........................................1.0*

Over 6/12 to 7/12............................1.25*

Over 7/12 to 8/12..............................1.5*

Over 8/12 to 9/12..............................2.0*

Over 9/12 to 10/12............................. 2.5

Over 10/12 to 11/12 ......................... 3.25

Over 11/12 to 12/12 ........................... 4.0

Over 12/12 to 14/12........................... 5.0

Over 14/12 to 16/12........................... 6.0

Over 16/12 to 18/12........................... 7.0

Over 18/12 to 20/12........................... 7.5

Over 20/12 to 21/12........................... 8.0

* 3 foot minimum in snow regions

Figure 10.9 Minimum Height From Roof To Lowest Discharge

Opening

 

 

NOTICE: Failure to properly caulk the roof flashing and pipe seams may permit entry of water.

Caulk the gap between the roof flashing and the outside diameter of the pipe.

Caulk the perimeter of the flashing where it contacts the roof surface. See Figure 10.10.

Caulk the overlap seam of any exposed pipe sections that are located above the roof line.

CAULK

Figure 10.10

E. Assemble and Install Storm Collar

CAUTION! Risk of Cuts, Abrasions or Flying Debris. Wear protective gloves and safety glasses during instal- lation. Sheet metal edges are sharp.

Connect both halves of the storm collar with two screws (see Figure 10.11).

Wrap the storm collar around the exposed pipe section closest to the roof and align brackets. Insert a bolt (provided) through the brackets and tighten the nut to complete the storm collar assembly. Make sure the collar is tight against the pipe section.

Slide the assembled storm collar down the pipe section until it rests on the roof flashing (see Figure 10.12).

Caulk around the top of the storm collar (see Figure 10.13).

Figure 10.11 Assembling the Storm Collar

Figure 10.12 Assembling the Storm Collar Around the Pipe

42

Heat & Glo • TRUE-36, TRUE-42, TRUE-502282-900 Rev. D • 8/12

Image 42
Contents Do Discardnot ModelsWhat to do if you smell gas HOT SurfacesCongratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingReference Materials Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace IPI Battery Tray/Battery Installation Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceControl Module Operation Module ResetNine Hour Safety Shutdown Feature Before Lighting FireplaceWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveFrequently Asked Questions Issue SolutionsAfter Fireplace is Lit Maintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianGlass Cleaning Exterior and Interior of Installed Glass D ReplacementBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardTRUE-36 Framing and ClearancesSelecting Appliance Location TRUE-42Minimum Framing Dimensions Constructing the Appliance ChaseClearances Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsNon-Combustible Zone Non-Combustible Mantel Legs or Wall ProjectionsNON-COMBUSTIBLE Material 21 MINCombustible Mantel Projections TRUE-50Hearth Extension ModelTermination Locations Vent Termination Minimum ClearancesFt. Canada ..........not to be installed above a gas meter Covered Alcove ApplicationsVent Information and Diagrams TRUE-50 NG/LP Top Vent Horizontal Termination One ElbowTRUE-36 NG/LP, TRUE-42 NG V1 Minimum MaximumTRUE-36 NG/LP, TRUE-42 NG/LP Two Elbows+ H MinimumTop Vent Horizontal Termination Three Elbows TRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LPFlue Restrictor Top Vent Vertical Termination ElbowsTop Vent Vertical Termination Three Elbows TRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LP Ht MaxPVK-80 and PVI-SLP Information PVI-SLPWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPFlat Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-ZoneGas Kit Vaulted Ceiling InstallationAppliance Preparation Vent PreparationSecuring and Leveling the Appliance Side Nailing Tab in Shipping Position Installing Non-combustible Facing Material Installing Non-Combustible Facing MaterialAssemble Vent Sections Installing Vent Pipe DVP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Gas Pressure Gas InformationFuel Conversion Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntelliFire PlusTM Ignition System Wiring Electrical InformationElectrical Service and Repair Junction Box Installation Access Through Left Column Access Through FireboxTemplate installation instruction FinishingFinishing Templates Splatter Guard Finishing Templates Bends Inoperable Fixed DoorsFACTORY-SUPPLIED NON-COMBUSTIBLE Combustible or Board MAX 21 MIN 10 Combustible Mantel Allowance TRUE-36, TRUE-4214 Non-combustible Facing Diagram Facing MaterialArch Dimension Inoperable Operable DoorDoors Operable DoorsAppliance Setup Glowing Ember Placement LED’sLOG Contacts Side Grate Tine Install the Log Assembly Log Set Assembly LOGS-TRUE36Models TRUE-36C, TRUE-36H, TRUE-36S Notch forTine LOG Contacts Left Grate TineBack Tine LOG Contacts Refractory Notch Front Tine LOG Contacts Grate Tine LOG #7 TRUE-42 onlyFlat Area LOG Placement Slots NotchLOG #4 Notch for For LOG #3TOP of Burned Area Near LOG #1 LOG Resting in Notch Back Tine Front Tine LOG Contacts Refractory Notch LOG Contacts 8 Grate TineTRUE-36 TRUE-42 TRUE-50 TOP Retaining Rail Notch Glass Frame Notch TRUE-42 Air Shutter SettingModel TRUE-36 TRUE-50Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsLocation Inches Millimeters Appliance Dimensions TRUE-42 & TRUE-50 Vent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-TRAPHorizontal Termination Cap DVP-TRAPFL RF6M RF12MBEK DVP-BEK2 COOL-ADDDescription Part Number Optional Wire HarnessPower Vent Inline SLP-LPCAt Depot Log Set AssemblyCService. ServicePartsParts Description Comments Part NumberService Parts StockedDescription Comments Part Number Log Set Assembly TRUE-42S, TRUE-42H, TRUE-42C LOGS-TRUE50 TRUE-50S, TRUE-50H, TRUE-50C #13 Valve Assembly TRUE-36, TRUE-42, TRUE-50MYSTIC-EMBERS Contact Information