Hearth and Home Technologies TRUE-36 Electrical Service and Repair Junction Box Installation

Page 46

D. Electrical Service and Repair

WARNING! Risk of Shock! Label all wires prior to dis- connection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.

WARNING! Risk of Shock! Replace damaged wire with type 105º C rated wire. Wire must have high temperature insulation.

E. Junction Box Installation

If the box is being wired from the INSIDE of the appliance:

The junction box is accessible through the front left column if finishing materials have not been installed. The junction box is also accessible through the firebox access panel. See Figure 12.2.

Remove the screw attaching the junction box/receptacle to the outer shell, rotate the junction box inward to dis- engage it from the outer shell. See Figure 12.3.

Pull the electrical wires from outside the appliance through the opening into the valve compartment and secure wires with a Romex connector. See Figure 12.3

Make all necessary wire connections to the junction box/ receptacle and reattach the junction box/receptacle to the outer shell.

NOTICE: DO NOT wire 110 VAC to wall switch.

Romex

 

Connector

WHT

 

 

BLK

 

WHT

14/2WG

BLK

 

GRN wire inside box

Copper ground attached to GRN screw with GRN wire

Figure 12.3 Junction Box Detail

 

ACCESS THROUGH LEFT COLUMN

ACCESS THROUGH FIREBOX

 

(Prior to installation of non-combustible board)

(After installation of non-combustible board)

 

 

GASKET

 

 

COVER

Figure 12.2 Junction Box Access

 

46

Heat & Glo • TRUE-36, TRUE-42, TRUE-502282-900 Rev. D • 8/12

Image 46
Contents Do Discardnot ModelsWhat to do if you smell gas HOT SurfacesCongratulations Homeowner Reference InformationTable of Contents User GuideTroubleshooting Appliance SetupReference Materials Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace IPI Battery Tray/Battery Installation Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceControl Module Operation Module ResetNine Hour Safety Shutdown Feature Before Lighting FireplaceWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Gasket Seal and Glass Assembly Inspection Maintenance Tasks-Qualified Service TechnicianGlass Cleaning Exterior and Interior of Installed Glass D ReplacementBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Any such action may cause a fire hazardTRUE-36 Framing and ClearancesSelecting Appliance Location TRUE-42Constructing the Appliance Chase Minimum Framing DimensionsClearances Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsNon-Combustible Zone Non-Combustible Mantel Legs or Wall ProjectionsNON-COMBUSTIBLE Material 21 MINCombustible Mantel Projections TRUE-50Hearth Extension ModelTermination Locations Vent Termination Minimum ClearancesFt. Canada ..........not to be installed above a gas meter Covered Alcove ApplicationsVent Information and Diagrams TRUE-50 NG/LP Top Vent Horizontal Termination One ElbowTRUE-36 NG/LP, TRUE-42 NG V1 Minimum MaximumTRUE-36 NG/LP, TRUE-42 NG/LP Two Elbows+ H MinimumTop Vent Horizontal Termination Three Elbows TRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LPFlue Restrictor Top Vent Vertical Termination ElbowsTop Vent Vertical Termination Three Elbows TRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LP Ht MaxPVK-80 and PVI-SLP Information PVI-SLPWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPFlat Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-ZoneGas Kit Vaulted Ceiling InstallationAppliance Preparation Vent PreparationSecuring and Leveling the Appliance Side Nailing Tab in Shipping PositionInstalling Non-combustible Facing Material Installing Non-Combustible Facing MaterialAssemble Vent Sections Installing Vent Pipe DVP PipeAttach Vent to the Firebox Assembly Assemble Pipe SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm Collar Install Horizontal Termination Cap Install Vertical Termination Cap Heat Shield Requirements for Horizontal Termination Gas Pressure Gas InformationFuel Conversion Gas ConnectionOptional Accessories Requirements Wiring RequirementsIntelliFire PlusTM Ignition System Wiring Electrical InformationElectrical Service and Repair Junction Box Installation Access Through Left Column Access Through FireboxFinishing Template installation instructionFinishing Templates Splatter Guard Finishing Templates Bends Inoperable Fixed DoorsFACTORY-SUPPLIED NON-COMBUSTIBLE Combustible or Board MAX 21 MIN 10 Combustible Mantel Allowance TRUE-36, TRUE-4214 Non-combustible Facing Diagram Facing MaterialArch Dimension Inoperable Operable DoorDoors Operable DoorsAppliance Setup Glowing Ember Placement LED’sLOG Contacts Side Grate Tine Install the Log Assembly Log Set Assembly LOGS-TRUE36Models TRUE-36C, TRUE-36H, TRUE-36S Notch forTine LOG Contacts Left Grate TineBack Tine LOG Contacts Refractory Notch Front Tine LOG Contacts Grate Tine LOG #7 TRUE-42 onlyFlat Area LOG Placement Slots NotchLOG #4 Notch for For LOG #3TOP of Burned Area Near LOG #1 LOG Resting in Notch Back Tine Front Tine LOG Contacts Refractory Notch LOG Contacts 8 Grate TineTRUE-36 TRUE-42 TRUE-50 TOP Retaining Rail Notch Glass Frame Notch TRUE-42 Air Shutter SettingModel TRUE-36 TRUE-50Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Appliance Dimensions TRUE-42 & TRUE-50 Vent Components Diagrams DVP-AS2DVP-TRAP DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2Horizontal Termination Cap DVP-TRAPFL RF6M RF12MBEK DVP-BEK2 COOL-ADDDescription Part Number Optional Wire HarnessPower Vent Inline SLP-LPCAt Depot Log Set AssemblyCService. ServicePartsParts Description Comments Part NumberStocked Service PartsDescription Comments Part Number Log Set Assembly TRUE-42S, TRUE-42H, TRUE-42C LOGS-TRUE50 TRUE-50S, TRUE-50H, TRUE-50C #13 Valve Assembly TRUE-36, TRUE-42, TRUE-50MYSTIC-EMBERS Contact Information