10 Installing Vent Pipe (DVP Pipe)

A. Assemble Vent Sections

Attach Vent to the Firebox Assembly

Note: The end of the pipe sections with the lanced tabs will face toward the appliance.

Attach the first pipe section to the starting collar:

Lanced pipe end of the starting collar.

Inner pipe over inner collar.

Push the pipe section until all lanced tabs snap in place.

Lightly tug on pipe to confirm it has locked.

Commercial, Multi-family (Multi-level exceeding two sto- ries), or High-Rise Applications

All outer pipe joints must be sealed with high temperature silicone (300ºF minimum continuous exposure rating), in- cluding the slip section that connects directly to the hori- zontal termination cap.

Figure 10.1 High Temperature Silicone Sealant

Apply a bead of silicone sealant (300ºF minimum con- tinuous exposure rating) inside the female outer pipe joint prior to joining sections. See Figure 10.1.

Only outer pipes need to be sealed. All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed in this manner, unless otherwise stated.

WARNING! Risk of Fire or Explosion! DO NOT break silicone seals on slip sections. Use care when remov- ing termination cap from slip pipe. If slip section seals are broken during removal of the termination cap, vent may leak.

A

B

Figure 10.2

Lances

Figure 10.3

Assemble Pipe Sections

Per Figure 10.2:

Start the inner pipe on the lanced end of section A into the flared end of section B.

Start the outer pipe of section A over the outer pipe of section B.

Once both vents sections are started, push firmly until all lanced tabs lock into place.

Lightly tug on the pipe to confirm the tabs have locked.

It is acceptable to use screws no longer than 1/2 in. (13

mm)to hold outer pipe sections together. If predrilling holes, DO NOT penetrate inner pipe.

For 90º and 45º elbows that are changing the vent direction from horizontal to vertical, one screw minimum should be put in the outer flue at the horizontal elbow joint to prevent the elbow from rotating. Use screws no longer than 1/2 in. (13 mm). If predrilling screw holes, DO NOT penetrate inner pipe.

Note: Make sure that the seams are not aligned to prevent unintentional disconnection.

CORRECT

Figure 10.4 Seams

INCORRECT

40

Heat & Glo • TRUE-36, TRUE-42, TRUE-502282-900 Rev. D • 8/12

Image 40
Contents Models What to do if you smell gasDo Discardnot HOT SurfacesCongratulations Homeowner Reference InformationTable of Contents User GuideTroubleshooting Appliance SetupReference Materials Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesIPI Battery Tray/Battery Installation Clear SpaceModule Reset Nine Hour Safety Shutdown FeatureControl Module Operation Before Lighting FireplaceLighting Instructions IPI Final inspection byWhat to do if YOU Smell GAS GAS ValveIssue Solutions Frequently Asked QuestionsAfter Fireplace is Lit Maintenance and Service Maintenance Tasks-Qualified Service Technician Glass Cleaning Exterior and Interior of Installed GlassGasket Seal and Glass Assembly Inspection D ReplacementBurner Ignition and Operation IPI Pilot Flame PatternsGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Any such action may cause a fire hazardFraming and Clearances Selecting Appliance LocationTRUE-36 TRUE-42Constructing the Appliance Chase Minimum Framing DimensionsClearances Mantel and Wall Projections Non-Combustible ZoneCombustible Mantel Legs or Wall Projections Non-Combustible Mantel Legs or Wall Projections21 MIN Combustible Mantel ProjectionsNON-COMBUSTIBLE Material TRUE-50Hearth Extension ModelTermination Locations Vent Termination Minimum ClearancesFt. Canada ..........not to be installed above a gas meter Covered Alcove ApplicationsVent Information and Diagrams Top Vent Horizontal Termination One Elbow TRUE-36 NG/LP, TRUE-42 NGTRUE-50 NG/LP V1 Minimum MaximumTwo Elbows + HTRUE-36 NG/LP, TRUE-42 NG/LP MinimumTop Vent Horizontal Termination Three Elbows TRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LPFlue Restrictor Top Vent Vertical Termination ElbowsTop Vent Vertical Termination Three Elbows TRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LP Ht MaxPVK-80 and PVI-SLP Information PVI-SLPVent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPInstall Attic Insulation Shield Installing the Optional Heat-ZoneGas KitFlat Ceiling Installation Vaulted Ceiling Installation Appliance Preparation Vent PreparationSecuring and Leveling the Appliance Side Nailing Tab in Shipping PositionInstalling Non-combustible Facing Material Installing Non-Combustible Facing MaterialInstalling Vent Pipe DVP Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsSecure the Vent Sections Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Horizontal Termination Cap Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire PlusTM Ignition System WiringOptional Accessories Requirements Electrical InformationElectrical Service and Repair Junction Box Installation Access Through Left Column Access Through FireboxFinishing Template installation instructionFinishing Templates Splatter Guard Finishing Templates Bends Inoperable Fixed DoorsFACTORY-SUPPLIED NON-COMBUSTIBLE Combustible or Board MAX 21 MIN 10 Combustible Mantel Allowance TRUE-36, TRUE-4214 Non-combustible Facing Diagram Facing MaterialDimension Inoperable Operable Door DoorsArch Operable DoorsAppliance Setup Glowing Ember Placement LED’sInstall the Log Assembly Log Set Assembly LOGS-TRUE36 Models TRUE-36C, TRUE-36H, TRUE-36SLOG Contacts Side Grate Tine Notch forTine LOG Contacts Left Grate TineBack Tine LOG Contacts Refractory Notch Front Tine LOG Contacts Grate Tine LOG #7 TRUE-42 onlyLOG Placement Slots Notch LOG #4Flat Area Notch for For LOG #3TOP of Burned Area Near LOG #1 LOG Resting in Notch Back Tine Front Tine LOG Contacts Refractory Notch LOG Contacts 8 Grate TineTRUE-36 TRUE-42 TRUE-50 TOP Retaining Rail Notch Glass Frame Notch Air Shutter Setting Model TRUE-36TRUE-42 TRUE-50Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramLocation Inches Millimeters Appliance Dimensions TRUE-42 & TRUE-50 Vent Components Diagrams DVP-AS2DVP-TRAP DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2Horizontal Termination Cap RF6M RF12M BEK DVP-BEK2DVP-TRAPFL COOL-ADDOptional Wire Harness Power Vent InlineDescription Part Number SLP-LPCLog Set Assembly CService. ServicePartsPartsAt Depot Description Comments Part NumberStocked Service PartsDescription Comments Part Number Log Set Assembly TRUE-42S, TRUE-42H, TRUE-42C LOGS-TRUE50 TRUE-50S, TRUE-50H, TRUE-50C #13 Valve Assembly TRUE-36, TRUE-42, TRUE-50MYSTIC-EMBERS Contact Information