Hearth and Home Technologies TRUE-50 Finishing Templates, Template installation instruction

Page 47

13 Finishing

A. Finishing Templates

Two side finishing templates and one top finishing template are supplied with the appliance. They are fastened to the top surround.

INSIDE FIT Method: The finishing template pieces are required for installations that require more than one inch thick finishing materials to be installed over the face of the factory-supplied 1/2 inch non-combustible board. Refer to section 13.E for more information.

OVERLAP Method: The supplied templates are not required for finishing materials less than one inch thick. The required decorative front will overlap finish materials less than one inch thick. Refer to section 13.E for more information.

Note: For Arch Door applications with finish material greater than one inch thick, an Arch Template Kit is available. Contact your dealer to order the arch template kit.

Template installation instruction

1.Determine if the required door options is a inoperable (fixed style) or operable (cabinet style). Doors denoted with an FS are inoperable. Doors denoted with a CS are operable. Refer to Section 13.E for door information.

2.Bend the left and right side templates for the appropriate door type using Figure 13.2 as a reference.

3.Locate the four threaded inserts on the inside edge of the fireplace and secure the side templates with the Phillips screws provided. See Figure 13.3.

4.Bend the top template as shown in Figure 13.1 and secure with the two screws provided. The bend will have two opposing 90 degree bends, similar to the bends on the side templates.

5.Remove all template components once finishing materials are secured.

3/4 IN.

1-1/2 IN.

INOPERABLE OPERABLE

DOORSDOORS

Figure 13.2 Left and Right Side Finishing Template Bends

TOP FINISHING

TEMPLATE

SIDE FINISHING

TEMPLATES

Figure 13.3 Top and Side Finishing Template Locations

Note: A thin layer of mortar may be applied over the visible non-combustible board between finishing material and the fireplace opening.

1-1/4 IN.

TAB

 

 

 

INOPERABLE DOORS - BEND DOWN

 

 

 

OPERABLE DOORS - DO NOT BEND DOWN

 

 

Figure 13.1 Top Finishing Template Bend

 

 

 

Heat & Glo • TRUE-36, TRUE-42, TRUE-502282-900 Rev. D

• 8/12

47

Image 47
Contents HOT Surfaces ModelsWhat to do if you smell gas Do DiscardnotHomeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting Limited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches IPI Battery Tray/Battery InstallationBefore Lighting Fireplace Module ResetNine Hour Safety Shutdown Feature Control Module OperationGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASAfter Fireplace is Lit Frequently Asked QuestionsIssue Solutions Maintenance and Service D Replacement Maintenance Tasks-Qualified Service TechnicianGlass Cleaning Exterior and Interior of Installed Glass Gasket Seal and Glass Assembly InspectionIPI Pilot Flame Patterns Burner Ignition and OperationTypical Appliance System Getting StartedAny such action may cause a fire hazard Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsTRUE-42 Framing and ClearancesSelecting Appliance Location TRUE-36Clearances Minimum Framing DimensionsConstructing the Appliance Chase Non-Combustible Mantel Legs or Wall Projections Mantel and Wall ProjectionsNon-Combustible Zone Combustible Mantel Legs or Wall ProjectionsTRUE-50 21 MINCombustible Mantel Projections NON-COMBUSTIBLE MaterialModel Hearth ExtensionVent Termination Minimum Clearances Termination LocationsCovered Alcove Applications Ft. Canada ..........not to be installed above a gas meterVent Information and Diagrams V1 Minimum Maximum Top Vent Horizontal Termination One ElbowTRUE-36 NG/LP, TRUE-42 NG TRUE-50 NG/LPMinimum Two Elbows+ H TRUE-36 NG/LP, TRUE-42 NG/LPTRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LP Top Vent Horizontal Termination Three ElbowsFlue Restrictor Elbows Top Vent Vertical TerminationTRUE-36 NG/LP, TRUE-42 NG/LP, TRUE-50 NG/LP Ht Max Top Vent Vertical Termination Three ElbowsPVI-SLP PVK-80 and PVI-SLP InformationNon-Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldInstalling the Optional Heat-ZoneGas Kit Flat Ceiling InstallationVent Preparation Appliance PreparationSide Nailing Tab in Shipping Position Securing and Leveling the ApplianceInstalling Non-Combustible Facing Material Installing Non-combustible Facing MaterialAssemble Pipe Sections Installing Vent Pipe DVP PipeAttach Vent to the Firebox Assembly Assemble Vent SectionsDisassemble Vent Sections Secure the Vent SectionsAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Horizontal Termination Cap Gas Connection Gas Information Fuel Conversion Gas PressureElectrical Information Wiring RequirementsIntelliFire PlusTM Ignition System Wiring Optional Accessories RequirementsAccess Through Left Column Access Through Firebox Electrical Service and Repair Junction Box InstallationFinishing Templates Template installation instructionFinishing Finishing Templates Bends Inoperable Fixed Doors Splatter GuardFACTORY-SUPPLIED NON-COMBUSTIBLE Combustible or Board 10 Combustible Mantel Allowance TRUE-36, TRUE-42 MAX 21 MINFacing Material 14 Non-combustible Facing DiagramOperable Doors Dimension Inoperable Operable DoorDoors ArchAppliance Setup LED’s Glowing Ember PlacementNotch for Install the Log Assembly Log Set Assembly LOGS-TRUE36Models TRUE-36C, TRUE-36H, TRUE-36S LOG Contacts Side Grate TineLOG Contacts Left Grate Tine TineLOG Contacts Grate Tine LOG #7 TRUE-42 only Back Tine LOG Contacts Refractory Notch Front TineNotch for For LOG #3 LOG Placement Slots NotchLOG #4 Flat AreaTOP of Burned Area Near LOG #1 LOG Resting in Notch LOG Contacts 8 Grate Tine Back Tine Front Tine LOG Contacts Refractory NotchTRUE-36 TRUE-42 TRUE-50 TOP Retaining Rail Notch Glass Frame Notch TRUE-50 Air Shutter SettingModel TRUE-36 TRUE-42IntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Location Inches Millimeters Appliance Dimension DiagramReference Materials Appliance Dimensions TRUE-42 & TRUE-50 DVP-AS2 Vent Components DiagramsHorizontal Termination Cap DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2DVP-TRAP COOL-ADD RF6M RF12MBEK DVP-BEK2 DVP-TRAPFLSLP-LPC Optional Wire HarnessPower Vent Inline Description Part NumberDescription Comments Part Number Log Set AssemblyCService. ServicePartsParts At DepotDescription Comments Part Number Service PartsStocked Log Set Assembly TRUE-42S, TRUE-42H, TRUE-42C LOGS-TRUE50 TRUE-50S, TRUE-50H, TRUE-50C TRUE-36, TRUE-42, TRUE-50 #13 Valve AssemblyMYSTIC-EMBERS Contact Information