Brother BAS-326F-0, BAS-311F-L, BAS-311F-0 instruction manual Installing the control box

Page 12

3. INSTALLATION

3-3. Installing the control box

(8)

(4)

(5) Spacer

 

(5)

(6) Flat washer

 

(7) Nut

 

(6)

 

 

(9)

(7)

 

 

 

(10)

 

 

(2)

 

 

(3)

 

(1)

 

 

(11)

1291S

 

1292S

 

 

 

1.Remove the screws (1), and then open the covers (panel mounting assembly (2) and main P.C. board mounting plate (3)).

Caution: When opening the cover, hold it securely so that it does not fall down.

2.Install the control box with the four accessory bolts (4), spacers (5), flat washers (6) and nuts (7) as shown in the illustration above.

*At this time, leave a gap of approximately 1 mm between the work table and the top of the box.

3.Close the covers (panel mounting assembly (2) and main P.C. board mounting plate (3)), and tighten them with the screws (1).

* The main P.C. board mounting plate (3) will be opened again during "3-11. Connecting the cords", so provisionally tighten it with the screw (1).

4.Install the power switch (8) with the two screws (9).

5.Secure the power switch cord with the five staples (10).

Note

Secure the motor cord with staples in such a way that it does not cross over the outlet port of the cooling fan (11)

Some specifications are not supplied with an accessory power switch (10). For these specifications, connect a power switch which satisfies the necessary regulations in the country of use.

Red

White

Black

Yellow/

Connect to the power switch. However,

the black wire is insulated to the inside of the box and is not used.

Connect to ground

0064Q

BAS-311F-0, 311F-L, 326F-0

5

Image 12
Contents BAS-326F-0 Safety Instructions Safety indications and their meaningsInstallation Environmental requirementsCleaning SewingMaintenace and inspection Direction of operation Frame side cover Contents Changing Special Functions Name of Major Parts Specifications BAS-311F-L *3 a BAS-326F-0 *4 aInstallation Table processing diagram PositioningInstalling the control box Installing the rubber cushions Installing the oil panInstalling the cushions Installing the switching plateInstalling the machine head Tilting the sewing machine head 1170S Connecting the ground wire Connecting the cords Installing the operation panelBAS-311F-0 Solenoid type only ORG Installing the belt cover Installing the foot switchInstalling the spool stand Installing the eye guard Installing the programmer option Installing the feed base cover supports BAS-311F-L, 326F-0 Installing the X feed base cover BAS-311F-L, 326F-0Connecting the tubes pneumatic type only When installing to the underside of the work table When installing to a beamLubrication Lubrication pointsBAS-326F-0 Installing the needle Correct OperationSelecting the needle and thread Threading the upper thread Winding the lower thread Replacing the bobbin case and threading the thread Sewing conditions and thread tensionLower thread tension Using the Operation Panel Explanation of panel110 Using the floppy disk Compatible types of floppy diskSetting the floppy disk How to use the cleaning diskUsing the program R/W Read/Write switch If an error message is displayedClearing the error To Read a pattern to memoryUsing the Test switch Checking the sewing pattern Resuming operation from a stopping poingUsing the emergency stop switch Continuing sewing from a stopping pointAdjusting the sewing Speed control Changing the X-SCALE and Y-SCALE settingsUsing the bobbin thread counter Using production counter Using single split mode Shifting a stitch pattern Sewing Before starting sewingSewing operation 1230S Cleaning and Inspection Cleaning the rotary hookLubrication Draining the oilCleaning the control box air inlet port Cleaning the air holes of belt cover and frame side coverCleaning the eye guard Checking the needleStandard Adjustments Adjusting the needle bar heightAdjusting the needle bar lift amount Adjusting the needle clearance Adjusting the driver needle guardAdjusting the shuttle race thread guide Adjusting the movable knife Replacing the movable and fixed knives AbcdAdjusting the presser foot Adjusting presser foot lift to 3 5mm Adjusting presser foot lift to 5 8 mmChanging the presser foot lift Standard presser foot lift is 3 mm max mmAdjusting the wiper For vertical wiper standardAdjusting the two-step work clamp lift amount BAS-311F-0 Solenoid typeBAS-326F-0 Adjusting the needle up stop position Checking the input sensor and DIP switch input Clearing all memory settings Checking the input voltageDIP Switch Panel DIP switch functionsDipswitch BAS-311F-L onlyDIP switches inside the control box DIP Switch CDipswitch Changing Special Functions and Using the Memory Switches If memo-0E is ON, the work clamp opens and closes twice Switch No When on Memo-10 Main circuit board instead of the voltage Switch No Possible Units Error Codes Can not backup data. Control PCB Turn off power and check connector P20 Gauge Parts List According to Subclasses Bobbin case assy S59221-001 LC Troubleshooting Incorrect needle and rotary hook timing Adjust the needle bar lift Amount Adjust the position Head position switch cord connection Options WP stitch device Automatic bobbin changerPlay prevention work clamp 15-1, Naeshiro-cho, Mizuho-ku, Nagoya 467-8561, Japan. Phone