3. INSTALLATION
(10)
(21)
(20)
Lock the cord
clamp at the top.
(13) | (12) |
1176S
13.Securely connect connectors P1 to P7, P14, P18, P23 and P26 as indicated in table below.
Note
Check that the connector is facing the correct way, and then insert it firmly until it locks into place. Furthermore, lock the cord clamp at the top.
Machine head connectors |
| Connection location on | Cord clamps used | |||
Connection location | No. of pins | Cord mark | circuit board | |||
| ||||||
X, Y, Sewing sensor | [1] | P1 | (ORG) | None | ||
Synchronizer | [2] | P2 | (SYNCHRO) | F | ||
EMERGENCY STOP switch | [3] | P3 | (HEAD) | None | ||
Solenoid valve | [4] | P4 | (VALVE) | None | ||
(for pneumatic) | ||||||
|
|
|
|
| ||
Solenoid |
|
|
|
| F, G | |
Presser foot | [5] | P5 | (SOL) | |||
Thread trimmer |
| |||||
|
|
|
|
| ||
Wiper |
|
|
|
|
| |
Pulse motor, Y | [6] | P6 (YPM) | F,G | |||
Pulse motor, X | [7] | P7 | (XPM) | F, G | ||
(blue) | ||||||
|
|
|
|
| ||
Upper shaft motor | None | P14 (UVM) | A, B, C, D, E | |||
Operation panel | [M] | P18 (PANEL) | A, B | |||
Head position switch | [23] | P23 (IMSW) | A, B | |||
|
|
|
|
|
| |
Machine specification select | [26] | P26 (SELECT) | None | |||
connector | ||||||
|
|
|
|
|
14.Secure the cord bundle (10) with the cord clamp (20).
Note
Check that the cords do not get pulled when the machine head is tilted back gently.
15.Close the cord presser plate (15) in the direction of the black arrow, and secure it by tightening the screws (14).
16.Install the control box cover (main P.C. board mounting plate (13)) with the six screws (12).
Note
Check that the cords do not come into contact with the fan (21) and that they are not clamped by the cover at this time.
13