Installation
36″ Refrigerators, Freezers
Step 11 | Check door alignment. The top of the door should |
Adjust Door | be parallel with the grille panel. If the door appears |
Alignment | to be too high or too low on the handle side, |
| adjustments can be made by turning the hinge. |
| • To raise the door, turn adjustable hinge pin |
| towards the right. |
| • To lower the door, turn hinge pin towards the left. |
| Turn the hinge pin with a 5/16″ wrench or, on some |
| models, use the 3/16″ Allen wrench taped to the |
| hinge. |
Step 12 | • Remove internal packing materials. |
Arrange Interior | • Remove tape from all shelves. |
and Set | • Set control at “5”. |
Temperature |
|
Controls | IMPORTANT: Allow 24 hours for temperatures to |
| stabilize before making adjustments. |
Step 13 | • Start the switch to I (on). The green light will come |
Start | on and the icemaker will begin operation |
Icemaker | automatically. |
| • Be sure nothing interferes with the sweep of the |
| feeler arm. |
| • Discard the first few batches of ice cubes. |
| • To turn the icemaker off, set the switch to O (off). |
| Allow 45 minutes for the icemaker to resume |
| operation. |
Door Should be Parallel
With Grille Panel
Bushing
Door Hinge
Case Hinge
Raise
Pin Shoulder
5/16" Wrench
Power Switch
Feeler Arm
Green Power Light
Step 14 | • A standard toekick is supplied. Install with 2 screws |
Install | provided, adjust to desired height and tighten |
Toekick | screws. |
| IMPORTANT: The vented toekick must remain |
| unobstructed for proper air circulation and operation. |
18