Goodmans DSX, GSZ, ASZ, SSX, ASX, DSZ, GSX, SSZ manual Defrost Cycle, Heating Cycle

Page 29

SYSTEM OPERATION

DEFROST CYCLE

The defrosting of the outdoor coil is jointly controlled by the defrost control board and the defrost thermostat.

Solid State Defrost Control

During operation the power to the circuit board is controlled by a temperature sensor, which is clamped to a feeder tube entering the outdoor coil. Defrost timing periods of 30, 60, or 90 minutes may be selected by connecting the circuit board jumper to 30, 60, or 90 respectively. Accumulation of time for the timing period selected starts when the sensor closes (approximately 31° F), and when the room thermostat calls for heat. At the end of the timing period, the unit’s defrost cycle will be initiated provided the sensor remains closed. When the sensor opens (approximately 75° F), the defrost cycle is terminated and the timing period is reset. If the defrost cycle is not terminated due to the sensor tempera- ture, a ten minute override interrupts the unit’s defrost period.

DF2

 

 

TEST

 

JUMPER WIRE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DF1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

60

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

30

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C Y

 

 

 

 

 

 

 

W2 R R DFT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATING CYCLE

The reversing valve on the GSZ, SSZ, ASZ and DSZ models is energized in the cooling cycle through the "O" terminal on the room thermostat.

These models have a 24 volt reversing valve coil. When the thermostat selector switch is set in the cooling position, the "O" terminal on the thermostat is energized all the time.

Care must be taken when selecting a room thermostat. Refer to the installation instructions shipped with the product for approved thermostats.

29

Image 29
Contents Service Instructions Email us at customerservice@goodmanmfg.com Recognize Safety SYMBOLS, Words and LabelsImportant Information Fax us at 713 Fax us at 931 438Safe Refrigerant Handling Split System Heat Pumps R410A Product IdentificationModel # Description Split System Air Conditioners R410A ASX130**1AA Single Piece Air Handlers AWUF****1AA MBR/MBE Air Handlers Product Identification 1824 3642 ASX13 AccessoriesDSX/SSX16 ASX18 ASZ13 DSZ/SSZ16 ASZ18 Expansion Valve Kits FSK01A Coil Accessories Electric Heat Kitapplications Aruf Electric Heat Kitapplications Aepf Condensing Unit Product DesignFigure a Capacity Control Heating System OperationCooling Cooling CycleHeating Cycle Defrost CycleCooling Cycle System Operation Description AFE18-60A Control BoardCOOLING/HP Analysis Chart Troubleshooting Chart61B ServicingChecking THERMOSTAT, WIRING, and Anticipator Checking Wiring3A Thermostat and Wiring Checking Voltage3C Heating Anticipator 3B Cooling AnticipatorTesting Coil Circuit Checking Time Delay RelayChecking Transformer Control Circuit Checking Cycle ProtectorSingle Phase Testing Compressor ContactorChecking Contactor AND/OR Relays Checking Contactor ContactsTesting FAN Relay Copeland Comfort Alert DiagnosticsDiagnostics Table Checking High Pressure Control Checking Loss of Charge ProtectorChecking LOW Pressure Control Checking CapacitorRELAY, Start 15A Resistance Check15B Capacitance Check 16B Checking FAN and Blower Motor ECM Motors 16A Checking FAN and Blower Motor Windings PSC MotorsChart on Next Chart from Previous 16C Checking ECM Motor Windings 16D ECM CFM Adjustments MBE / AepfCFM GE X13TM Motor Connections 16E Blower Performance Data16F Checking GE X13TM Motors Checking Compressor Testing Compressor Windings17A Resistance Test 17B Ground TestUnloader Test Procedure 17C Unloader Test Procedure17D Operation Test Compressor Ground TestTesting Defrost Control Testing Crankcase Heater Optional ItemTesting Defrost Thermostat Checking Reversing Valve and SolenoidChecking Heater Limit Controls 40 MBR/AR*F Electronic Blower Time Delay RelayChecking Heater Elements Sequence of OperationHeating Operation MBR/AR*F with Single Stage Heat PumpsMBE/AEPF with Single Stage GSX, ASX and SSX Condensers 41 MBE/AEPF with GSX, SSX, ASX, DSXDefrost Operation 41A MBE/AEPF with Single Stage GSZ, SSZ, & ASZ Heat Pumps MBE/AEPF with TWO Stage ASX & DSX Condensers Sequence of OperationMBE/AEPF with TWO Stage ASZ & DSZ Heat Pump Units Electric Heater Optional Item Formulas 61A Checking Heater Limit Controls61B Checking Heater Fuse Link Optional Electric Heaters Refrigeration Repair Practice Leak Testing Nitrogen or NITROGEN-TRACEDEvacuation Brazing MaterialsEvacuation ChargingChecking Compressor Efficiency Final Charge AdjustmentTXV Valves 105B Thermostatic Expansion ValvePressure vs. Temperature Chart 410A Required Liquid Line Temperature Underfeeding OverfeedingSuperheat Checking SubcoolingChecking Expansion Valve Operation 109A TWO Speed ApplicationFixed Orifice Restrictor Devices Subcooling Formula = Sat. Liquid Temp. Liquid LineOvercharge of Refrigerant Checking Restricted Liquid LineNON-CONDENSABLES Compressor BurnoutRefrigerant Piping Accessories for lines greater than 80 feetLong Line SET Application R-410A Tube SizingInstallation Requirements Initial System Charging AIR Handler External StaticStatic Pressure Drop Coil Static Pressure DropTotal External Static ALL Fuel System AFE18-60A Control Board Accessories Wiring Diagrams10kw and Below, One Stage Electric Heat OT/EHR18-60 #2 GRD PLM PLF XFMR-R XFMR-C After Installing Optional Heat KIT, Mark AN X Provided Above HKR Heat Kit GRD PLM PLF