Goodmans GSZ, ASZ, SSX, ASX, DSZ, DSX, GSX, SSZ manual Grd Plm Plf

Page 80

ACCESSORIES WIRING DIAGRAMS

HIGH VOLTAGE!

DISCONNECT ALL POWER BEFORE SERVICING OR INSTALLING THIS

UNIT. MULTIPLE POWER SOURCES MAY BE PRESENT. FAILURE TO

DO SO MAY CAUSE PROPERTY DAMAGE, PERSONAL INJURY OR DEATH.

FL

HTR1 TL

 

BK

BK

1

 

 

 

2

 

 

RD

 

BK

PU

 

3

BL

 

 

 

 

 

 

M1

 

4

 

 

 

 

R

 

5

 

M2

 

 

 

 

 

WH

 

6

 

BK

 

7

 

BK

 

 

 

RD

 

8

 

 

 

9

L1 L2

FL

HTR2 TL

FL

HTR1 TL

BK

 

 

RD

M1

M3

 

R

 

 

M2

M4

RD

BK

BK

RD

RD

 

 

BK

BK

1

 

 

2

 

RD

 

PU

 

3

BL

 

 

 

 

4

 

 

5

WH

 

6

 

 

7

 

 

8

 

 

9

 

FL

 

 

 

 

 

 

 

FL

HTR1

TL

 

BK

 

 

 

FL

HTR2

TL

 

RD

 

 

 

 

 

 

 

 

 

 

 

HTR3

TL

 

 

 

 

 

 

 

 

 

 

BK

1

 

 

RD

YL

 

 

2

 

YL

 

PU

 

 

BK

 

 

BL

3

 

 

 

 

 

 

 

 

M1

M3

M1

 

RD

 

 

 

 

BL

4

RD

 

 

 

 

 

 

M2

M4

M2

 

 

 

 

 

 

R1

 

R2

BR

5

BK

B K

 

 

 

 

 

 

RD

 

 

 

WH

6

 

 

 

 

 

 

 

 

 

 

 

 

7

 

 

 

YL

 

 

 

8

 

 

 

 

 

 

 

 

 

 

 

BK

 

 

 

 

 

 

RD

 

 

 

9

 

FL

 

 

 

 

 

 

 

FL

HTR1 TL

 

BK

 

 

 

 

 

 

 

 

 

 

FL

HTR2 TL

 

RD

 

 

 

 

 

 

 

 

 

 

FL

HTR3 TL

 

YL

 

 

 

 

HTR4 TL

 

BL

BK

 

 

 

 

 

 

 

1

 

 

 

PU

 

 

 

2

 

BL

 

 

 

 

 

 

BK

RD

 

BL

 

3

 

 

 

 

 

 

 

YL

M1

M3

M5

M7

RD

 

 

BL

4

RD

 

 

 

 

 

M2

M4

M6

M8

 

 

 

BK

R1

 

R2

BR

5

BK

 

 

 

 

 

 

RD

 

 

 

WH

6

 

 

 

 

 

 

 

 

 

 

 

 

7

 

 

 

YL

 

 

 

 

 

 

 

BL

 

 

 

8

 

 

 

BK

 

 

 

 

 

 

 

RD

 

 

 

9

ONE (1) ELEMENT ROWS

L1

L2

TWO (2) ELEMENT ROWS

 

 

L1 L2 L1 L2 THREE (3) ELEMENT ROWS

L1 L2 L1 L2 FOUR (4) ELEMENT ROWS

NOTE: WHEN INSTALLING HEATER KIT, ENSURE SPEED TAP DOES NOT EXCEED MINIMUM BLOWER SPEED (MBS) SPECIFIED FOR THE AIRHANDLER/HEAT ER

KIT COMBINATION ON THIS UNIT'S S&R PLATE. AFTER INSTALLING OPTIONAL HEAT KIT, MARK AN "X" IN THE PROVIDED ABOVE. MARK ACCORDING TO NUMBER OF HEATER ELEMENT ROWS INSTALLED. NO MARK INDICATES NO HEAT KIT INSTALLED.

 

 

 

 

TERMINAL BLOCK SHOWN

L1

L2

 

 

 

EQUIPMENT GROUND

 

 

 

 

 

FOR 50HZ MODELS ONLY

 

 

 

 

 

 

 

SEE NOTE 2

 

 

 

 

USE COPPER OR ALUMINUM WIRE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

R C G W1 W2 Y1 Y2 O DH 1 2 3 4 5

 

BK

RD

GRD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PLM

1

2

3

4

5

6

7

8

9

 

 

 

RD

 

 

PLF

 

2

 

 

 

 

 

 

 

 

 

 

 

 

 

1

3

4

5

6

7

89

 

 

 

RD

 

 

 

 

BK

RD

 

BL

BR

WH

SEE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE 4

 

 

 

 

WH

 

 

 

 

 

 

 

 

 

 

 

 

 

BL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

GR

 

 

 

RD

 

 

 

 

 

 

 

 

 

 

RD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CR

 

 

 

 

BK

 

 

 

 

 

 

 

 

XFMR-R

 

 

 

 

 

 

 

RD

 

 

 

 

 

COM

 

 

4

 

 

 

 

 

 

 

 

 

 

R

RD

 

 

 

 

BK

 

 

SEE NOTE 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EBTDR

RD

 

 

RD

 

 

C 1

 

 

 

 

 

 

 

XFMR-C

 

7

1

 

RD

2

3

240

 

 

 

 

 

 

SEE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TR

 

 

 

 

C

 

BL

 

 

NOTE 3

 

 

 

 

 

 

 

 

GR

G NO NC

A

B

 

 

 

5

24V

4

 

 

 

 

GR

 

 

 

 

 

 

 

 

BL

 

 

 

 

BL

 

 

BL

 

 

BL

 

 

 

 

 

 

 

BL

 

 

 

 

 

RD

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RD

 

 

 

 

 

 

 

 

 

 

 

 

 

COPPER OR ALUMINUM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER SUPPLY

 

 

 

 

 

 

 

 

 

 

 

 

1 2 3 4 5

 

 

(SEE RATING PLATE)

 

 

 

 

 

 

 

 

 

 

 

 

 

USE MIN. 75°C FIELD WIRE

 

 

 

 

 

 

 

 

 

 

 

EM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C L G N

 

 

 

 

 

 

 

 

 

 

 

 

 

RD BK

BL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IF REPLACEMENT OF THE ORIGINAL WIRES

SUPPLIED WITH THIS ASSEMBLY IS NEC ESSARY,

USE WIRE THAT CONFORMS TO THE

NATIONAL ELECTRIC CODE.

 

 

 

 

208/240 VOLTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

XFMR-R

COM

L1

 

 

 

 

 

 

L2

 

R

 

 

 

 

 

 

 

 

 

 

1

PLM

 

 

 

 

 

PLM 2

 

XFMR-C

EBTDR

 

 

 

 

EM

 

 

 

 

 

1

PLF

 

 

 

 

 

 

C

 

 

 

C L G N

 

 

PLF 2

 

G

NO NC

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

2

3

SEE NOTE 1

 

 

 

 

 

 

TR

 

 

 

 

 

 

CR

 

 

 

 

 

 

 

 

 

 

7

4

 

 

 

 

 

 

 

B

 

A

 

 

 

 

4

24V

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

5

4 PLF

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

2

EM

 

 

 

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

C

 

 

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

R C G W1 W2 Y1 Y2 O DH 1 2 3 4 5

 

 

 

 

 

 

COLOR CODE

 

 

WIRING CODE

 

 

 

 

 

BK

BLACK

GR

GREEN

FACTORY WIRING

 

 

 

 

 

RD

RED

 

PU

PURPLE

HIGH VOLTAGE

 

 

 

 

 

YL

YELLOW

BR

BROWN

LOW VOLTAGE

 

 

 

 

 

BL

BLUE

 

WH

WHITE

FIELD WIRING

 

 

 

 

 

 

 

 

 

 

HIGH VOLTAGE

 

 

 

 

 

COMPONENT CODE

 

LOW VOLTAGE

 

 

 

 

 

 

 

 

 

 

 

 

 

EM

EVAPORATOR MOTOR

TR

TRANSFORMER

 

 

 

 

 

TB

TERMINAL BOARD

PLF

FEMALE PLUG CONNECTOR

 

 

 

 

R

RELAY

 

 

PLM

MALE PLUG CONNECTOR

 

 

 

 

CR

CONTROL RELAY

FL

FUSE LINK

 

 

 

 

EBTDR

ELECTRONIC BLOWER TIME

TL

THERMAL LIMIT

 

 

 

 

Notes:

 

DELAY RELAY

 

HTR

HEAT ELEMENTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1)Red wires to be on transformer terminal "3" for 240 volts and on terminal "2" for 208 volts.

2)See composite wiring diagrams in installation instructions for proper low voltage wiring connections.

3)Confirm speed tap selected is appropriate for application. If speed tap needs to be changed, connect red wire from terminal 4 of CR relay to appropriate tap at TB

4)Brown and white wires are used with Heat Kits only.

0140A00034

Typical Wiring Schematic ASPF with Electric Heat.

This wiring diagram is for reference only. Not all wiring is as shown above.

Refer to the appropriate wiring diagram for the unit being serviced.

80

Image 80
Contents Service Instructions Recognize Safety SYMBOLS, Words and Labels Email us at customerservice@goodmanmfg.comImportant Information Fax us at 713 Fax us at 931 438Safe Refrigerant Handling Product Identification Split System Heat Pumps R410AModel # Description Split System Air Conditioners R410A ASX130**1AA Single Piece Air Handlers AWUF****1AA MBR/MBE Air Handlers Product Identification 1824 3642 Accessories ASX13DSX/SSX16 ASX18 ASZ13 DSZ/SSZ16 ASZ18 Expansion Valve Kits FSK01A Coil Accessories Electric Heat Kitapplications Aruf Electric Heat Kitapplications Aepf Product Design Condensing UnitFigure a Capacity Control System Operation HeatingCooling Cooling CycleDefrost Cycle Heating CycleCooling Cycle System Operation AFE18-60A Control Board DescriptionTroubleshooting Chart COOLING/HP Analysis ChartServicing 61BChecking Wiring Checking THERMOSTAT, WIRING, and Anticipator3A Thermostat and Wiring Checking Voltage3B Cooling Anticipator 3C Heating AnticipatorChecking Time Delay Relay Testing Coil CircuitChecking Transformer Control Circuit Checking Cycle ProtectorTesting Compressor Contactor Single PhaseChecking Contactor AND/OR Relays Checking Contactor ContactsCopeland Comfort Alert Diagnostics Testing FAN RelayDiagnostics Table Checking Loss of Charge Protector Checking High Pressure ControlChecking LOW Pressure Control Checking CapacitorRELAY, Start 15A Resistance Check15B Capacitance Check 16A Checking FAN and Blower Motor Windings PSC Motors 16B Checking FAN and Blower Motor ECM MotorsChart on Next Chart from Previous 16D ECM CFM Adjustments MBE / Aepf 16C Checking ECM Motor WindingsCFM GE X13TM Motor Connections 16E Blower Performance Data16F Checking GE X13TM Motors Testing Compressor Windings Checking Compressor17A Resistance Test 17B Ground Test17C Unloader Test Procedure Unloader Test Procedure17D Operation Test Compressor Ground TestTesting Crankcase Heater Optional Item Testing Defrost ControlTesting Defrost Thermostat Checking Reversing Valve and Solenoid40 MBR/AR*F Electronic Blower Time Delay Relay Checking Heater Limit ControlsChecking Heater Elements Sequence of OperationMBR/AR*F with Single Stage Heat Pumps Heating OperationMBE/AEPF with Single Stage GSX, ASX and SSX Condensers 41 MBE/AEPF with GSX, SSX, ASX, DSXDefrost Operation 41A MBE/AEPF with Single Stage GSZ, SSZ, & ASZ Heat Pumps Sequence of Operation MBE/AEPF with TWO Stage ASX & DSX CondensersMBE/AEPF with TWO Stage ASZ & DSZ Heat Pump Units Electric Heater Optional Item Formulas 61A Checking Heater Limit Controls61B Checking Heater Fuse Link Optional Electric Heaters Leak Testing Nitrogen or NITROGEN-TRACED Refrigeration Repair PracticeEvacuation Brazing MaterialsCharging EvacuationFinal Charge Adjustment Checking Compressor Efficiency105B Thermostatic Expansion Valve TXV ValvesPressure vs. Temperature Chart 410A Required Liquid Line Temperature Overfeeding UnderfeedingSuperheat Checking Subcooling109A TWO Speed Application Checking Expansion Valve OperationFixed Orifice Restrictor Devices Subcooling Formula = Sat. Liquid Temp. Liquid LineChecking Restricted Liquid Line Overcharge of RefrigerantNON-CONDENSABLES Compressor BurnoutAccessories for lines greater than 80 feet Refrigerant PipingLong Line SET Application R-410A Tube SizingInstallation Requirements AIR Handler External Static Initial System ChargingStatic Pressure Drop Coil Static Pressure DropTotal External Static Accessories Wiring Diagrams ALL Fuel System AFE18-60A Control Board10kw and Below, One Stage Electric Heat OT/EHR18-60 #2 GRD PLM PLF XFMR-R XFMR-C After Installing Optional Heat KIT, Mark AN X Provided Above HKR Heat Kit GRD PLM PLF