Southbend STRG-5D, STRG-3D Electrical Requirements, GAS Pressure Requirements, Water Requirements

Page 6

SPECIFICATIONS

STRATOSTEAM COUNTERTOP STEAMER

ELECTRICAL REQUIREMENTS

One fused electrical connection is required to the terminal board of each steamer. All steamers are shipped per customer order, three phase or single phase. (A kit is available for field conversion to three phase or single phase.) The fused connection must be wired for the required voltage and maximum amperage as listed in the chart below:

Voltage

 

Total Connected Amps

 

Model STRG-3D

Model STRG-5D

 

 

1 Phase

3 Phase

1 Phase

3 Phase

120

V 60 Hz

0.37

0.37

0.37

0.37

 

 

 

 

 

 

208

V 50/60 Hz

0.21

0.21

0.21

0.21

 

 

 

 

 

 

220

V 50/60 Hz

0.20

0.20

0.20

0.20

 

 

 

 

 

 

240

V 60 Hz

0.18

0.18

0.18

0.18

 

 

 

 

 

 

GAS PRESSURE REQUIREMENTS

OPERATING

Natural Gas 4" W.C.

Propane Gas 10" W.C.

INCOMING

Natural Gas 7" W.C. Minimum

Propane Gas 11" W.C.

WATER REQUIREMENTS

To meet warranty requirements, the water supply must be as follows:

Connection

1/4" compression, cold water

 

 

 

Pressure

30 to 60 PSI

 

 

Total Dissolved Solids (TDS)

60 PPM or less

 

 

Hardness

2 grains (35 PPM) or less

pH

7.0 to 7.5

Maximum Fill Capacity

0.87 gallons

Typical usage is 0.46 gallons per minute at 45 PSI.

In order to minimize service problems and to meet the warranty requirements, a water treatment system (softener) is recommended when water quality does not meet the limits stated above.

DRAIN REQUIREMENTS

The drain outlet has a 1" NPT female connector. Do NOT directly connect the drain to a plumbing system unless you also install an “open funnel” downstream of this connection (see Figure 7 on page 17). There must be no back-flow or back-pressure into the drain connection!

PAGE 6 OF 50

OWNERS MANUAL 1185290

Image 6
Contents StratoSteam Countertop Steamer Safety Precautions Introduction Location of Serial PlatesDimensions ClearancesDimensions Water Requirements Electrical RequirementsGAS Pressure Requirements Drain RequirementsOperation Troubleshooting by OperatorStartup ShutdownTimer ControlsCooking Tips Suggested Cooking Times Cleaning & Maintenance Daily Cleaning and MaintenancePeriodic DE-LIMING AS Needed STAINLESS-STEEL SurfacesInstallation Attach Legs UnpackingAttach Legs Mounting on Cabinet Base Installation on CountertopAttach to Countertop Stacking TWO SteamersLocation of Connections and Vents Drain ConnectionWater Drain Water ConnectionWater Connection Testing the GAS Supply Piping GAS ConnectionElectrical Connection Check the Installation SHUT-DOWN and WIPE-CLEAN SteamerCheck Steamer Operation Service Troubleshooting FLOWCHARTS, PROCEDURES, and Wiring Diagrams HOW the Steamer OperatesHow the Steamer Operates Steamer Not Heating Up, Power Light Is Not Lit Disconnect Power AT Circuit BreakerCheck that water-supply pressure is adequate Buzzer Does Not Come On When Timer Runs Out Hot Surface Ignitor Glows Red, But Burners Not On Hot Surface Ignitor Does Not Glow Red Not All Burners Ignite Burner Lights But Goes Out Within a Few Seconds Symptom Possible Cause Cure Power Switch Check Disconnect Power AT Circuit BreakerTimer and Buzzer Check Door Switch Check High-Limit Thermostats Check Water Solenoid Check Wiring Diagram for 208/220/240 Volt and 115 Volt Models Parts Diagram PartsStructural Parts See parts list on previous Door Assembly Parts Door Switch Parts Control Panel Parts Burner Assemblies, Thermocouple, and Ignition Module Water Train Parts Water-Train Parts Cabinet Base Parts Cabinet-Base Parts Stratosteam Countertop Steamer StratoSteam Countertop Steamer Models STRG-3D STRG-5D