8-12CHAPTER 8: MANAGING LAN EMULATION CLIENTS

Table 8-16

Task Actions

 

 

 

 

 

 

 

 

Menu

 

Enter

Result

 

Sequence

 

 

 

 

 

 

 

 

[5] le

 

1

Bridge Number {0-3}

The LEC expected LE_ARP

 

[3] operational

2

LEC expected LE_ARP

response-time parameter is

 

[7] arp

 

updated for the specified

 

 

 

response-time {1-30}

 

 

 

 

bridge.

 

 

 

 

 

 

 

 

 

 

 

Example

Enter: [5][3][7] 0 2

The expected LE_ARP response-time parameter for the LEC of bridge #0 is updated to 2 seconds.

Flush-timeoutEnter the bridge number and flush-timeout value to update the LEC flush-timeout parameter.

Table 8-17

Task Actions

 

 

 

 

 

 

 

 

Menu

 

 

 

 

 

Sequence

 

Enter

Result

 

 

 

 

 

 

 

[5] le

 

1

Bridge Number {0-3}

The LEC flush-timeout

 

[3] operational

2

LEC flush-timeout {1-4}

parameter is updated for the

 

[8] flush

 

specified bridge.

 

 

 

 

 

 

 

 

 

 

Example

Enter: [5][3][8] 0 3

The flush-timeout parameter for the LEC of bridge #0 is updated to 3 seconds.

Path-switching-Enter the bridge number and path-switching-delay value to update the delay LEC path-switching-delay parameter.

Table 8-18Task Actions

Menu Sequence

Enter

Result

 

 

 

 

[5] le

1

Bridge Number {0-3}

The LEC path-switching-delay

[3] operational

2

LEC path-switching-delay

parameter is updated for the

[9] path switch

specified bridge.

 

{1-8}

 

 

 

 

 

 

 

Page 108
Image 108
3Com 7600 manual 18Task Actions