Allied Telesis AT-IFS802SP manual Hardware Installation, Installation Steps

Models: AT-IFS802SP

1 101
Download 101 pages 49.51 Kb
Page 17
Image 17

AT-IFS802SP-80 User Manual

13

Chapter 3 Hardware Installation

In this paragraph, we will describe how to install the 8 10/100TX + 2 10/100/1000T/SFP Combo with X-Ring L2 Managed Industrial Switch and the installation points attended to it.

3.1 Installation Steps

1.Unpack the Industrial switch

2.Check if the DIN-Rail is screwed on the Industrial switch or not. If the DIN-Rail is not screwed on the Industrial switch, please refer to DIN-Rail Mounting section for DIN-Rail installation. If users want to wall mount the Industrial switch, please refer to Wall Mount Plate Mounting section for wall mount plate installation.

3.To hang the Industrial switch on the DIN-Rail track or wall.

4.Power on the Industrial switch. Please refer to the Wiring the Power Inputs section for knowing the information about how to wire the power.The power LED on the Industrial switch will light up. Please refer to the LED Indicators section for indication of LED lights.

5.Prepare the twisted-pair, straight through Category 5 cable for Ethernet connection.

6.Insert one side of RJ-45 cable (category 5) into the Industrial switch Ethernet port (RJ-45 port) and another side of RJ-45 cable (category 5) to the network device’s Ethernet port (RJ-45 port), ex: Switch PC or Server.The UTP port (RJ-45) LED on the Industrial switch will light up when the cable is connected with the network device. Please refer to the LED Indicators section for LED light indication.

[note]

Make sure that the connected network devices support MDI/MDI-X. If it does not support, use the crossover category-5 cable.

7. When all connections are set and LED lights all show in normal, the installation is complete.

Page 17
Image 17
Allied Telesis AT-IFS802SP manual Hardware Installation, Installation Steps