Chapter 5 - System Setup

Installation Test

Note: This test is intended to verify the correct setup and instal- lation of the SymmetraTM system. It is not intended to explain its usage. In this procedure, you will be instructed to ignore PowerView messages. Refer to chapters 6 & 7 for detailed infor- mation about the operation of SymmetraTM.

The following test procedure is intended to ensure that the MIM, RIM and the power and battery modules have been correctly installed. It will verify that the SymmetraTM is re- sponding correctly and is ready to deliver power to the load equipment. A qualified electrician and/or the installer of the SymmetraTM system should perform this test.

Before this test can be conducted, the main intelligence mod- ule (MIM), the PowerView display, at least one power mod- ule and at least one battery module must be properly installed. Read the installation procedures provided in this chapter.

Installation Test/Checklist

q3. From the startup screen, press the “ESC” navigation key to display the top level menu screen.

Fig 5-16 Top Level Menu & The Enter Navigation Key

Press the down arrow navigation key to select “Status,” and then press the “Enter” navigation key. The voltage status screen appears.

Fig 5-17 Voltage Status Screen

q 1. Make sure all three switches - system enable, mainte-

Read the voltage status screen to verify that input voltage (Vin)

nance bypass, and input circuit breaker - are in the “off” or

is nominally either 220V, 230V or 240V. Verify that output

“standby” position. Make sure all load equipment is either

voltage (Vout) is approximately 0V.

turned off or is unplugged from the SymmetraTM .

 

 

 

Note: Load equipment can be left connected during this test

q 4. Press the down arrow key to scroll to the frequency

procedure; however, power will be switched “on” and “off” to

status screen. See figure 5-18. Verfiy that the input frequency

the load equipment. Therefore, it is recommended that load

is approximately 50 Hz.

equipment be switched to the “off” position until the comple-

 

 

 

 

 

 

tion of this test.

 

 

 

q2. Switch both the input circuit breaker and the system

enable switch to the “on” position. SymmetraTM will power

 

 

 

Fig 5-18 Frequency Status Screen

up internally but will not deliver output voltage. The

PowerView will display text. Depending on the configura-

 

 

 

tion of the SymmetraTM , one or more messages such as“Num-

q 5. Press the down arrow key to the battery status screen.

ber of Battery Modules has changed” may appear. Press the

 

 

 

“ESC” navigation key until the startup screen appears. See

 

 

 

figure 5-15. Verify that the input voltage is 220V, 230V or

 

 

 

240V nominal, that the output voltage reads “000Vout,” and

 

 

 

that all four of the PowerView LED indicator lights are off.

 

 

 

 

 

 

 

Fig 5-19 Battery Status Screen

 

 

 

Verfiy the following:

 

 

 

q The number of battery modules reported (01 in the

 

 

 

example below) is the same as the actual number of

 

 

 

battery modules that are installed.

 

 

 

q The number of “bad” modules reported is zero.

 

 

 

q A minimum of 90V of battery voltage is reported.

 

 

 

 

 

 

Note: The reported battery voltage will vary from approximately

 

 

 

90V to 148V, depending on the state of the battery module

 

Fig 5-15 Startup Screen

charge. If the reported voltage is less than 90V, allow the bat-

 

tery modules to recharge. (To recharge the battery modules,

 

 

 

 

 

 

leave the system enable switch and the input circuit breaker in

 

 

 

the “on” position, and allow the Power Array to remain idle for

 

 

 

30 minutes.)

 

 

 

5-7