Chapter 5 - System Setup

q10. Place the SymmetraTM into Bypass mode by follow- ing the screen sequence in figure 5-24.

Fig 5-24 Initiate Bypass Mode

The Bypass LED indicator should glow, and the PowerView display will indicate that the “UPS (SymmetraTM) IS BY- PASSED.”

q11. Return the SymmetraTM to the On-Line mode of op- eration by following the screen sequence in figure 5-25.

Fig 5-25 Return to On-Line Mode

The Bypass LED indicator should cease to glow, and the mes- sage“UPS IS OUT OF BYPASS”will appear on the PowerView display. Press any key to return to the startup screen.

q12. Power down the load equipment by following the screen sequence in figure 5-26.

Fig 5-26 Power Down the Load Sequence

From the Control menu, power down the load equipment by executing the “UPS LOAD OFF”command. After several sec- onds, the “UPS LOAD IS OFF”message is displayed. All LED indicators on the PowerView should be off.

q13. Power down the SymmetraTM by switching the sys- tem enable switch and the input circuit breaker to the “stand by” position. The installation procedure has now been com- pleted.

Note: This procedure is an installation checklist. Read and follow the steps in Chapter 7 to configure the SymmetraTM Power Array for your specific power needs.

5-9

Page 45
Image 45
American Power Conversion PX user manual Return to On-Line Mode