Join the PDU, UPS, and XR Battery Enclosures

1.Move the PDU, Symmetra PX UPS, and XR Battery Enclosures into position, aligning the holes in the adjacent side panels.

2.Level the PDU, Symmetra PX UPS, and XR Battery Enclosure by using a level and adjusting the leveling feet on each enclosure.

3.The following enclosures will need to be attached, refer to the graphic below:

An adjacent PDU and UPS

An adjacent XR Battery Enclosure and UPS

Adjacent XR Battery Enclosures

psx0023a

InfraStruXure System - Installation and Start-Up

13

Page 17
Image 17
APC 600, 480, 208 manual Join the PDU, UPS, and XR Battery Enclosures