Manuals
/
APC
/
Home Audio
/
Stereo System
APC
600, 480, 208
manual
Models:
208
480
600
1
44
48
48
Download
48 pages
19.37 Kb
41
42
43
44
45
46
47
48
Specifications
Install
Symbols used in this manual
Connect control wiring
Cascade XR Battery Enclosures
Safety
Total Power Off
Page 44
Image 44
Page 43
Page 45
Page 44
Image 44
Page 43
Page 45
Contents
Installation and Start-Up
About this Manual
Contents
Specifications
Safety
Symbols used in this manual
Installation/Maintenance
Maintenance performed while the PDU is receiving input power
Total Power Off
Emergency Power Off EPO
EMI
Site Planning
Space Considerations
Page
Installation Procedures
Installation Procedure Overview
See Start-Up Procedure on page 29 for detailed instructions
Tools Required
Level the PDU, UPS, NetShelter, and XR Battery Enclosures
Exchange Side Panels
Exchange Side Panels
Connect Battery Enclosure communication cables
Join the PDU, UPS, and XR Battery Enclosures
Attach conduit to the PDU for the input conductors
Access the PDU Main Input switch
Connect Utility Conductors to the PDU
Install a circuit breaker
Input Voltage Circuit Breaker Amperage
Route the input conductors to the Main Input switch
Connect input conductors
GEC
Connect AC Power and Control Wiring
PDU
Connect control wiring
Connect DC Power Wiring, if Applicable
Cascade XR Battery Enclosures
XR Battery Enclosure
Connect an Emergency Power Off Switch
Overview
Connect an EPO switch to the user connection plate
Overview
Route and Attach Power Cables to the Racks
Overhead Wiring
Under Floor Wiring
For single-feed devices within a
InfraStruXure System Installation and Start-Up
Route Data Cables to the InfraStruXure Manager Hub or Switch
Apply power to the system
Safety warnings
Heavy Use two people to lift and install power modules
Start-Up Procedure Apply power to the system
Verify UPS battery operation
Control Menu
Top-Level Menu
Verify proper voltage and phase rotation at the UPS
Start the UPS
Fuel % Load % 208V out000V 60Hz Runtime 1hr 2m
Verify bypass operation
Confirm Yes, UPS into Bypass No, Abort
Power the PDU Distribution Breakers
Ensure that the Q2 circuit breaker on the PDU is closed on
Configure the InfraStruXure Manager
Page
Specifications
KW InfraStruXure PDU
PD40F6FK1-M PD40G6FK1-M PD40L6FK1-M
Environmental
03/2008
APC Worldwide Customer Support
990-1483C
Top
Page
Image
Contents