5.1.5 Power on checks

5.1.5 Power on checks

If at any time one of the Axis LEDs is illuminated red, this indicates that the NextMove BXII has detected a fault - see section 6.

1.Turn on the 24VDC supply.

2.After a brief test sequence the Status display should show the node number, for example 5-2 OperationManual background (the factory preset). If the display is not lit then re-check the power supply connections.

The NextMove BXII is now ready to be configured using WorkBench v5.