Terminal and Jumper Locations
Figure
Figure 2-2 Terminal and Jumper Locations
J19 | AC Line | Control | |
L1, L2, L3 | Terminals | ||
|
Motor
M1, M2, M3
Wiring Considerations
Interconnection wiring is required between the motor control, AC power source, motor, host control and any operator interface stations. Use listed closed loop connectors that are of appropriate size for wire gauge being used. Connectors are to be installed using crimp tool specified by the manufacturer of the connector. Only Class 1 wiring should be used.
Installation