3. INSTALLATION
3-16. Installing the programmer (option)
[Vertical][Flat]
|
|
|
|
|
|
| (2) |
| (1) |
|
|
|
|
|
|
| |
| (1) |
|
|
|
|
|
|
| (2) |
|
|
|
|
|
| (4) | (3) |
|
|
| |||
1181S |
|
| 1182S | 1183S |
1.Install the programmer support (2) to the work table with the two screws (1).
2.Insert the programmer connector (4) securely into the left side of the operation panel (3).
(3)(5)
(7)
(1) | (5) |
|
| (3) |
| (4) |
| (6) |
(2) | (8) |
1184S | 1185S |
1.Remove the four screws (1), and then remove the side cover (2).
2.Install the work clamp lifter connecting rod (4) to the screw (3) on the work clamp lifter lever (5).
3.After installing,
Note
Remove chain hooking back (7) which is attached to the work clamp lifter pedal (6) before tilting back the machine head.
Move the treadle support base (8) back and forth to adjust so that the chain which is attached to the presser lifter connecting rod (4) and the presser lifter treadle (6) does not touch the cables.
16