SECTION I – EQUIPMENT CHECK LIST

U.S.A. EQUIPMENT CHECK LIST

(For Canadian Equipment Check List, Turn to Pages 4 and 5)

This Equipment Check List has been provided so that the Installer can determine if all parts have been provided for the boiler ordered. It covers standard equipment for both steam and water boilers without Tankless Heaters. Heaters or optional equipment ordered will be in addition to, or in lieu of, equipment shown below.

By opening cartons in numerical sequence, boiler assembly is simplified. If there is an exception, it will be pointed out in the boiler assembly procedure. When it does occur, you will find that assembly of the boiler is further simplified.

BOILER SIZE

5006B 5007B 5008B 5009B 5010B 5011B 5012B 5013B 5014B 5015B 5016B 5017B 5018B 5019B 5020B 5021B 5022B 5024B 5026B

(1)

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

LEH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1)

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

REH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1)

4

5

6

7

8

8

9

10

11

12

13

14

15

16

16

17

18

19

21

C

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2)

---

---

---

---

---

---

---

---

---

1

1

1

1

1

1

2

2

3

3

CX

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(3)

---

---

---

---

---

1

1

1

1

---

---

---

---

---

1

---

---

---

---

CXP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1)Section Marking Cast on Section

(2)“C” Cast on Section - When supply and return connections are tapped, section is paint stencilled “CX”

(3)“C” Cast on Section - When supply and return connections are tapped and plugged, section is paint stencilled “CXP”

CARTONS, PACKAGES, OR BUNDLES

1Base-Burner-Manifold Assembly (By Gas and By Pilot System) - One Left & One Right Req’d on 5015B and Larger Boilers

COMPLETE

1

1

1

1

1

1

1

1

1

---

---

---

---

---

---

 

---

 

---

 

---

 

6

7

8

9

10

11

12

13

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L

L

L

L

L

L

 

L

 

L

 

L

L

L. SUB-BASE

---

---

---

---

---

---

---

---

---

1S

1S

1S

1S

1S

1S

1S

 

1S

 

1S

 

1S

 

 

 

 

 

 

 

 

 

 

15

16

17

18

19

20

 

21

 

22

 

24

26

 

 

 

 

 

 

 

 

 

 

R

R

R

R

R

R

 

R

 

R

 

R

R

R. SUB-BASE

---

---

---

---

---

---

---

---

---

1S

1S

1S

1S

1S

1S

1S

 

1S

 

1S

 

1S

 

 

 

 

 

 

 

 

 

 

8

9

9

10

10

10

 

10

 

10

 

13

13

2Tie Rod Bundle(s) 4 Sizes - One to Five Per Boiler

22”

---

---

1

---

---

---

---

 

---

---

---

---

---

---

---

---

---

---

---

---

27”

---

---

1

2

1

---

---

 

---

2

1

---

---

---

---

1

---

---

---

2

37”

1

---

---

---

1

2

1

 

---

1

2

3

2

1

---

3

4

3

1

---

42”

---

1

---

---

---

---

1

 

2

---

---

--

1

2

3

---

---

1

3

3

2 A

Draw-up Rod Bundle(s) 3 Sizes - One to Three Per Boiler

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

37¾”

---

---

---

---

---

2

2

 

1

1

---

---

---

---

---

---

---

---

---

---

49¼”

1

1

---

---

---

---

---

 

1

1

2

2

1

1

1

---

---

---

3

2

67¼”

---

---

1

1

1

---

---

 

---

---

---

---

1

1

1

2

2

2

---

1

3 A

Boiler Assembly Carton(s) 6 Sizes - One to Five Per Boiler

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3A6

1

---

---

---

---

1

---

 

---

---

---

1

---

---

---

---

1

---

---

---

3A7

---

1

---

---

---

---

1

 

---

---

---

---

1

---

---

---

---

1

---

---

3A8

---

---

1

---

---

---

---

 

1

---

---

---

---

1

---

---

---

---

---

1

3A9

---

---

---

1

---

---

---

 

---

1

---

---

---

---

1

---

---

---

1

1

3A10

---

---

---

---

1

---

---

 

---

---

1

---

---

---

---

1

---

---

---

---

3AM

---

---

---

---

---

1

1

 

1

1

1

2

2

2

2

2

3

3

3

3

4Boiler Sealing Carton(s) 5 Sizes - One to Three Per Boiler

06

1

---

---

---

---

2

1

---

---

---

---

---

---

---

2

---

1

---

---

07

---

1

---

---

---

---

1

2

1

---

---

---

---

---

---

2

---

---

---

08

---

---

1

---

---

---

---

---

1

2

1

---

---

---

---

---

---

1

---

09

---

---

---

1

---

---

---

---

---

---

1

2

1

---

---

---

2

2

2

10

---

---

---

---

1

---

---

---

---

---

---

---

1

2

1

1

---

---

1

5Integral Drafhood Carton(s) 5 Sizes - One to Four Per Boiler (Natural & LP)

06

1

---

---

---

---

2

1

---

---

---

---

---

---

---

2

1

---

1

---

07

---

1

---

---

---

---

1

2

1

---

---

---

---

---

---

1

2

3

3

08

---

---

1

---

---

---

---

---

1

2

1

---

---

---

---

---

---

---

1

09

---

---

---

1

---

---

---

---

---

---

1

2

1

---

---

---

---

---

---

10

---

---

---

---

1

---

---

---

---

---

---

---

1

2

1

1

1

---

---

Page 2
Image 2
Burnham K50 manual Section I Equipment Check List