SEQUENCE OF OPERATION

When operating control closes, the electric spark and pilot valve are automatically energized. The sensing probe proves the presence of the pilot flame. Internal switch action de-energizes the spark and energizes the main gas valves starting main burner operation. When the operating control is satisfied the pilot gas valve and the main gas valves are de-energized stopping the burner operation.

In the event of excessive steam pressure (steam boiler) or excessive boiler water temperature (water boiler), the high limit control will de-energize the pilot gas valve and the main gas valves stopping burner operation.

The low water cut-off will also stop burner operation if the water level in the boiler should drop below the lowest safe level.

Fig. 43

SCHEMATIC WIRING DIAGRAM - EI CONTROL SYSTEM (V88 GAS TRAIN)

U.S.A. 5010B THRU 5014B

CANADA 5006B THRU 5014B