1.INSTALLATION OF GAS VALVE TRANSFORMER AND PILOT PIPING (for Robertshaw Pilot Piping, see Fig. 29) – Attach the bracket for mounting of the junction box to the lower front corner of the Jacket Upper End Panel using two #10-32 x ½” MS and nuts. Mount junction box to bracket using #8 SMS, see Fig. 25 or 26. Connect pilot solenoid valve to bottom center knockout of J-box using conduit fittings furnished,

(V88 Gas Train only) see Fig. 30. Mount transformer on J-box. If Foot Mounted Transformer, connect to

J-box with Straight Connector, BX, Straight Connector and ½” pipe coupling. Drill holes in Jacket and fasten Transformer using SMS. Install RV-12LT pilot line regulator (packed in Gas Train Carton) and other 1/8” pipe fittings as shown in Section VI, Repair Parts (V88 Gas Train only).

Using ¼” OD aluminum tubing, connect the inlet of the pilot solenoid valve to the pilot valve installed in the manual shut off valve in the Gas Train. Using ¼” aluminum tubing, complete installation to Pilot Burner, see Fig. 30 (V88 Gas Train only).

Fig. 28

INSTALLATION OF S8610M MODULE

Fig. 29

PILOT PIPING - EI CONTROL SYSTEM (Robertshaw7000)

U.S.A. 5006B THRU 5009B