Installation

Applying Power to the Chassis

Applying Power to the Chassis

Locate the power switches on the rear of the chassis (O/I) and turn them on (I). After powering up the BROADway chassis, all the LEDs will go through an initialization process where they all light. After the cards have initialized, only the top left (MODULE) green LED on each card and one of the NSP101 ACTIVE LEDs will lamp as shown in the following figure. After the standby NSP101 has synchronized its database with the active NSP101, its ACTIVE LED will link green slowly. These LEDs remain lit during normal operation.

NIP RX1

NIP RX2

RX1

RX2

RX3

RX4

 

 

SCP-1

NIP TX1

NIP TX2

TX1

TX2

TX3

TX4

ALARMS

RESET

SCP-2

NIP-4

NIP-8

NIP-3

NIP-7

NIP-2

NIP-6

OSP-4

OSP-3

OSP-2

B R O

NIP-1

 

E

 

L

 

U

 

D

M

O

 

13

INTERFACE

NIP-5

NSP-2

NSP-1

 

E

 

L

 

U

 

D

M

O

 

13

INTERFACE

2

1

ACTIVE

ALARM SUM

PWR

2

ETH

 

 

 

1

 

UIP-2

ACTIVE

 

 

 

UIP-1

 

 

 

 

1

3

5

7

9 11 13 15

OSP-1

BSP-4

BSP-3

BSP-2

BSP-1

 

E

E

 

C

 

L

 

A

 

U

E

F

 

D

 

 

O

R

 

M

T

 

 

IN

 

A D w a y

TM

Slots that have no cards installed will remain unlit.

DANGER! THIS SYSTEM HAS TWO POWER INPUT CONNECTIONS. DISCONNECT BOTH BEFORE SERVICING TO AVOID ELECTRIC SHOCK. SEE CABLING POWER AND GROUND ON PAGE 2-6.

Should you need to power cycle the BROADway system then power down the chassis using the power switches at the rear of the chassis (O/I) and wait at least five seconds before powering it back on.

BROADway - Release 4.00

2-29

Page 45
Image 45
Carrier Access 770-0125-AB installation manual Applying Power to the Chassis, W a y