Cisco Systems 124778, 124792 manual Two-Inch Clearance Around Front Ventilation Opening, GMT Drawer

Models: 159330 124778 124792

1 96
Download 96 pages 5.18 Kb
Page 7
Image 7
F I G U R E S

 

 

 

 

 

 

 

 

 

 

F I G U R E S

Figure 1-1

Cisco AC/DC Power System (with Optional 1RU DC Distribution Shelf)

1-2

 

 

 

Figure 1-2

Component Locations (Front View) on the System Shelf with LCD Screen

1-2

 

 

 

Figure 1-3

Component Locations (Front View) on the System Shelf without an LCD Screen 1-3

Figure 1-4

CSCO-PWR-RECT Rectifier Module

1-4

 

 

 

 

 

Figure 1-5

GMT Fuse Panel

1-4

 

 

 

 

 

 

 

 

 

Figure 1-6

1 RU Distribution Shelf

1-5

 

 

 

 

 

 

 

 

Figure 1-7

Circuit Breaker

1-5

 

 

 

 

 

 

 

 

 

 

Figure 1-8

ESD Wrist Strap Connection Point

1-9

 

 

 

 

 

 

Figure 1-9

Two-Inch Clearance Around Front Ventilation Opening 1-10

 

 

 

 

Figure 2-1

Ground Symbol

2-1

 

 

 

 

 

 

 

 

 

 

Figure 2-2

Cisco AC/DC Power System Front View

2-4

 

 

 

 

 

Figure 2-3

ETSI Shelf Ear Mounts (system shelf and 1RU Distribution Shelf) 2-5

 

 

 

 

Figure 2-4

Installing the System Shelf

2-5

 

 

 

 

 

 

 

Figure 2-5

1 RU Distribution Cable Dressing

2-6

 

 

 

 

 

 

Figure 2-6

1 RU Distribution Shelf Installation

2-7

 

 

 

 

 

Figure 2-7

1 RU Distribution Shelf Alarm Cabling

2-8

 

 

 

 

 

Figure 2-8

Installing 1 RU DC Cabling

2-9

 

 

 

 

 

 

 

Figure 2-9

Removing the System Shelf Rear Cover

2-10

 

 

 

 

 

Figure 2-10

Installing the System Shelf Ground

2-11

 

 

 

 

 

Figure 2-11

Installing the 1 RU Distribution Shelf Ground

2-12

 

 

 

 

Figure 2-12

Installing the AC Cable Shelf

2-14

 

 

 

 

 

 

Figure 2-13

Routing AC Cables

2-15

 

 

 

 

 

 

 

 

 

Figure 2-14

Installing a Rectifier

2-17

 

 

 

 

 

 

 

 

Figure 2-15

Removing a Rectifier Blank Faceplate

2-18

 

 

 

 

 

Figure 2-16

Circuit Breaker On/Off Positions

2-19

 

 

 

 

 

 

Figure 2-17

Removing the 1 RU Distribution Shelf Faceplate

2-19

 

 

 

 

Figure 2-18

Installing a Circuit Breaker

2-20

 

 

 

 

 

 

 

Figure 2-19

Removing the Controller Faceplate

2-22

 

 

 

 

 

Figure 2-20

Installing an Alarm Cable

2-23

 

 

 

 

 

 

 

Figure 2-21

Alarm Board Connection Points 2-24

 

 

 

 

 

 

Figure 2-22

GMT Drawer 2-25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cisco AC/DC Power System User Guide, R1.0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

May 2006

 

 

 

 

 

 

 

 

 

 

vii

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 7
Image 7
Cisco Systems 124778 Two-Inch Clearance Around Front Ventilation Opening, GMT Drawer, F I G U R E S, RU Distribution Shelf