Chapter 2 Replacing Cards in the Cisco 3230 ISR Rugged Enclosure

Card Replacement Process

Inserting the Card Stack into the Extrusion

To insert the card stack into the extrusion, follow these steps:

Step 1 Make sure that the LED cable is connected to the FESMIC.

Step 2 Route the FESMIC LED cable over the top of the stack.

Step 3 Align each card’s Wedge Loks so that the angles on the Wedge Loks match the angle of the Wedge Lok rail. Figure 2-9shows proper Wedge Lok alignment.

Figure 2-9 Wedge Lok Alignment

2 1

1

127880

1

Wedge Lok alignment

2

Wedge Lok rail

Step 4 Place the extrusion on a sturdy, flat surface with the I/O end cap side facing up.

 

 

Cisco 3200 Series Router Hardware Upgrade Guide

 

 

 

 

 

 

OL-15983-01

 

 

2-11

 

 

 

 

 

Page 27
Image 27
Cisco Systems 3200 Series manual Inserting the Card Stack into the Extrusion, Wedge Lok Alignment