1.1 Unpacking
Open the shipping carton of the Switch and carefully unpack its contents, the carton should contain the following items:
zOne 24+2G, 24 port Fast Ethernet Layer 2 Switch.
zMounting Kit: 2 mounting brackets and screws
zFour rubber feet with adhesive backing.
zOne AC power cord.
zOne
zThis User’s Guide (Disk or CD).
Note: to get the “Stacking” feature, please install the optional Gigabit Module (purchased separately).
1.2 Installation
You can use the following guidelines when choosing a place to install the Switch.
zThe surface must support at least 3 Kg of weight. Do not place heavy object on the Switch.
zVisually inspect the power cord and AC power connector.
zMake sure that there is proper heat dissipation form and adequate ventilation around the Switch.
Desktop or Shelf Installation:
When installing the Switch on the desktop of shelf, the rubber feet included with the device should first be attached. Attach these cushioning feet on the bottom at each corner of the device. Allow adequate space for ventilation between the device and the objects around it.
Rack Installation:
The 24+2G switch can be mounted in an ELA
- 8 -