- 8 -
1.1 Unpacking
Open the shipping carton of the Switch and carefully unpack its contents, the carton should contain
the following items:
z One 24+2G, 24 port Fast Ethernet Layer 2 Switch.
z Mounting Kit: 2 mounting brackets and screws
z Four rubber feet with adhesive backing.
z One AC power cord.
z One RS-232 cable
z This Users Guide (Disk or CD).
Note: to get the “Stacking” feature, p lease install the optional Gigabit Module (purchased separately).

1.2 Installation

You can use the following guidelines when choosing a place to install the Switch.
z The surface must support at least 3 Kg of weight. Do not place heavy object on the Switch.
z Visually inspect the power cord and AC power connector.
z Make sure that there is proper heat dissipation form and adequate ventilation around the Switch.
Desktop or Shelf Installation:
When installing the Switch on the desktop of shelf, the rubber feet included with the device should
first be attached. Attach these cushioning feet on the bottom at each corner of the device. Allow
adequate space for ventilation between the device and the objects around it.
Rack Installation:
The 24+2G switch can be mounted in an ELA standard-sized, 19-inch rack, which can be placed in a
wiring closet with other equipment. To install, attach the mounting brackets on the switch side panels
(one on each side) and secure them with the screws provided. Then, use the screws provided with the
equipment rack to mount the switch on the rack.