Compaq manual ProLiant 3000 Setup and Installation Guide

Models: 3000

1 137
Download 137 pages 52.02 Kb
Page 64
Image 64

4-3

1.Back up your server data.

2.Shut down the operating system in an orderly manner as directed in your operating system instructions.

3.Power down the server and remove the power cord.

IMPORTANT: The system power in the ProLiant 3000 server does not completely shut off with the front panel Power On/Standby switch. The two positions of the switch functions as ON and STANDBY, rather than ON and OFF. The STANDBY position removes power from most of the electronics and the drives but portions of the power supply and some internal circuitry remain active. Consequently, to completely remove all power from the system, you must disconnect the power cord from the server. In systems with multiple power supplies, you must disconnect all the power cords to completely remove power from the system.

NOTE: After you move the Power On/Standby switch to the Standby position it may take the operating system up to 30 seconds before shutting down the power.

WARNING: Before removing the server top panel, ensure that the server is turned off and that the power cord is disconnected from the electrical outlet.

4.Disconnect any other external equipment connected to the computer.

5.Loosen the two thumbscrews on the front of the unit.

ProLiant 3000 Setup and Installation Guide

Page 64
Image 64
Compaq manual ProLiant 3000 Setup and Installation Guide