4-1

Chapter 4

Installing Hardware Options

This chapter is divided into two major parts as follows:

Accessing Non Hot-Plug Areas - you must shut down the server power in order to install options, upgrades or replacements in the following areas:

Processor boards and sockets

Memory board and sockets

System Board

Drive Cage Backplane Board

Power Supply Backplane Board

Three shared PCI/EISA slots

Five PCI slots

Fans

Accessing Hot-Plug Areas - you can install hot-plug options, upgrades or replacements without shutting down the power in the following areas:

SCSI drive bays

Power supplies

NOTE: The illustrations in this chapter may vary slightly depending on whether you have a tower model or rack model.

ProLiant 3000 Setup and Installation Guide

Page 62
Image 62
Compaq 3000 manual Installing Hardware Options