Figure 44. Installing the system battery
1. system battery | 2. positive side of the battery |
Next steps
1.Install the cooling shroud.
2.Follow the procedure listed in After working inside your system.
3.While booting, press <F2> to enter System Setup and ensure the battery is operating properly.
4.Enter the correct time and date in System Setup Time and Date fields.
5.Exit System Setup.
Related videos
http://www.Dell.com/XCSeries/XC730xd/Battery
Power supply units
Your system supports one of the following:
•Two 495 W, 750 W, or 1100 W AC power supply modules or
•Two 1100 W DC power supply modules or
•Two 750 W mixed mode power supply modules
NOTE: Titanium power supply unit is nominally rated for 200 VAC to 240 VAC input only.
99