Emerson PMC-CGM manual Hardware Preparation and Installation Requirements

Models: PMC-CGM

1 66
Download 66 pages 1.17 Kb
Page 26
Image 26

Hardware Preparation and Installation

Requirements

 

 

2.Check for damage and report any damage or differences to the customer service.

3.Remove the desiccant bag shipped together with the module and dispose of it according to your country’s legislation.

The product is thoroughly inspected before shipment. If any damage occurred during transportation or any items are missing, please contact our customer's service immediately.

2.2.2Requirements

Before you power up the module, calculate the power needed according to your system configuration.

2.2.2.1Environmental Requirements

You must make sure that the board, when operated in your particular system configuration, meets the environmental requirements specified below.

Operating temperatures refer to the temperature of the air circulating around the board and not to the component temperature.

Board Damage

High humidity and condensation on the board surface causes short circuits.

Do not operate the board outside the specified environmental limits. Make sure the board is completely dry and there is no moisture on any surface before applying power.

26

PMC-CGM Installation and Use (6806800D53C)

Page 26
Image 26
Emerson PMC-CGM manual Hardware Preparation and Installation Requirements