Hardware Preparation and Installation

2

2.1Overview

In this section, you can find information on the following topics:

zThings to observe before the installation

zInstallation procedure

zAvailable accessories

2.2Before Installation

This section provides the following information:

zUnpacking and inspecting the module

zRequirements

2.2.1Unpacking and Inspecting the Module

Damage of Circuits

Electrostatic discharge and incorrect module installation and removal can damage circuits or shorten their life.

Before touching the module or electronic components, make sure that you are working in an ESD-safe environment.

Shipment Inspection

To inspect the shipment, perform the following steps.

1.Verify that you have received all items of your shipment: Printed user manual

PMC-CGM module

Any optional items ordered

PMC-CGM Installation and Use (6806800D53C)