Emerson PMC-CGM manual Hardware Upgrades and Acessories, Installation Procedure, Removal Procedure

Models: PMC-CGM

1 66
Download 66 pages 1.17 Kb
Page 30
Image 30

Hardware Preparation and Installation

Hardware Upgrades and Acessories

 

 

Before installing an PMC module observe the following notes.

zTo ensure proper EMC shielding, either operate the blade with the PMC-CGM module installed or with a blind panel.

zIf the blade is upgraded with a PMC module, ensure that the blind panel is stored in a safe place in order to be reused again when removing the PMC module.

Installation Procedure

To install the PMC module, proceed as follows:

1.Remove the blind panel from the PMC slot of the ATCA-F103.

2.Store the blind panel in a safe place.

3.Connect the PMC module carefully to the PMC slot.

4.Make sure that standoffs of the PMC module cover the mounting holes of the blade.

5.Place the screws delivered with the PMC module into the mounting holes of the blade (from the back side of the blade).

6.Fasten screws.

7.Connect interface cables as required - for more information refer to the ARTM-F103- STX Installation and Use manual.

Removal Procedure

To remove a PMC module, proceed as follows:

1.Remove interface cables, if applicable.

2.Remove screws from back side of the blade’s PMC slot.

3.Disconnect PMC module carefully from the PMC slot.

4.Install the blind panel.

2.5Hardware Upgrades and Acessories

In multi-shelf configurations, you need a clock distribution cable. Emerson offers an accessory kit which contains a category 5 cable of 10 m length. For more information refer to the CABLE- CGM2-CLK Installation and Use manual.

30

PMC-CGM Installation and Use (6806800D53C)

Page 30
Image 30
Emerson PMC-CGM manual Hardware Upgrades and Acessories, Installation Procedure, Removal Procedure