2.4Connection to Gas Line

The H52 Series has received the CE mark for the countries and gas categories indicated in the accompanying table. NOTE: The nominal heat input (Qn) is 21kW except for AT, DE, LU, and for category 3B/P under 50 mbar, which is 23kW.

CE Approved Gas Categories by Country*

COUNTRIES

CATEGORIES

GAS

PRESSURE (mbar)

AUSTRIA (AT)

II2H3B/P

G20

20

G30, G31

50

 

 

BELGIUM (BE)

I2E(R)B

G20, G25

20, 25

I3+

G30, G31

28-30, 37

 

DENMARK (DK)

II2H3B/P

G20

20

G30, G31

30

 

 

 

II2Esi3+

G20, G25

20, 25

FRANCE (FR)

G30, G31

28-30, 37

 

II2Esi3P

G20, G25

20, 25

 

 

G31

50

 

 

FINLAND (FI)

II2H3B/P

G20

20

G30, G31

30

 

 

 

II2ELL3B/P

G20, G25

20

GERMANY (DE)

G30, G31

50

 

 

I3P

G31

50

GREECE (GR)

II2H3+

G20

20

G30, G31

28-30, 37

 

 

ITALY (IT)

II2H3+

G20

20

G30, G31

28-30, 37

 

 

IRELAND (IE)

II2H3+

G20

20

G30, G31

28-30, 37

 

 

LUXEMBOURG (LU)

II2E3B/P

G20

20

G30, G31

50

 

 

 

II2L3P

G25

25

NETHERLANDS (NL)

G31

50

 

II2L3B/P

G25

25

 

 

G30, G31

30

 

 

NORWAY (NO)

I3B/P

G30, G31

30

PORTUGAL (PT)

II2H3+

G20

20

G30, G31

28-30, 37

 

 

 

II2H3+

G20

20

SPAIN (ES)

G30, G31

28-30, 37

 

II2H3P

G20

20

 

 

G31

37, 50

 

 

SWEDEN (SE)

II2H3B/P

G20

20

G30, G31

30

 

 

UNITED KINGDOM (GB)

II2H3+

G20

20

G30, G31

28-30, 37

 

 

 

 

 

 

 

 

 

 

* H152-2 units are not approved for G30 (Butane) gas.

The size of the gas line used for installation is very important. If the line is too small, the gas pres- sure at the burner manifold will be low. This may cause slow recovery and delayed ignition. Fry- master recommends the incoming gas supply line be a minimum of 1½” (38 mm) in diameter. Refer to the chart on the following page for the minimum sizes of connection piping.

2-5

Page 10
Image 10
Frymaster H52 Series warranty Connection to Gas Line, Countries Categories GAS