Main
i
INTRODUCTION
Request
CAUTION ON SAFETY
iii
Caution on wiring
Caution on use
iv
Caution on use Prohibition
Caution on maintenance / inspection
Page
vi
CONTENTS
vii
1
1. OUTLINE
2. SPECIFICATIONS
3. COMPOSITION
2
4. INSTALLATION
4.1 Selection of installation site
4.2 Selection of gas sampling location
3
4.3 Installation work
4.4 Connection of cables
4.5 Connection of pipes
4
*
Outside exhaust
(Note 5)
Drain
5. DESCRIPTION OF EACH PART
6. PREPARATION FOR OPERATION
6.1 Injection of clean water
6.2 Supply of external power
6.3 Check of sample piping, exhaust piping, etc.
6
6.4 Airtightness test
6.5 Setting of temperature inside locker
6.6 Warm-up time
7
7. INDICATION/OPERATION PANEL
7.1 Name and description of each component of indication/operation panel
8
7.2 Function and indication of indication/operation panel
9
7.3 General operation of indication/operation panel
ZERO
Advice on Operation
NO
8. CALIBRATION
8.1 Kinds of standard gas
8.2 Preparation of standard gas
11
Fig. 8-1 Pressure regulation for standard gas cylinder
12
8.3 Calibration concentration setting (except zirconia O2 sensor)
13
14
8.4 Calibration concentration setting (zirconia O2 sensor)
FUNC
CAL SET
ENT
15
16
8.5 Zero calibration (air point calibration in case of zirconia O2 sensor)
( Lamp is turned off after calibration )
ZERO
CAL
17
8.6 Span calibration (low concentration point calibration in case of zirconia O2 sensor)
( Lamp is turned off after calibration )
( )
CAL
18
8.7 Auto calibration
19
Example of auto calibration time chart for 4-component measurement
20
ENT
FUNC AUTO CAL
( ) ( )
21
22
23
24
25
9. OPERATION
9.1 Operating procedure
Prohibition
26
10. MAINTENANCE
10.1 Routine maintenance and inspection
27
Fig. 10-1 Conditioner
28
10.2 Periodic maintenance and inspection
10.3 Other maintenance and inspection
29
10.4
Concentration guarantee term of standard gas cylinder (for NO
, SO
, CO and O
30
31
32
B
A
C
33
34
35
10.6 Maintenance of zirconia O2 sensor
3816
18
Front view Side view
11. STANDARD ACCESSORIES AND SPARES
11.1 Standard accessories
Note) Part No. 8 will be shipped in connection with the solenoid valve in the locker.
37
11.2 Spares for 1 year (optional)
38
12. PROCESSING OF HEATING PIPE ENDS
12.1 Outline
No good Good
300mm 300mm 300mm 300mm 300mm 300mm
39
12.2 End processing method
40
41
GoodNo good
42
12.5 Specifications of tube trace
12.6 Specifications of heating pipe
43
Note) Pressure control valve is used.
13. TROUBLESHOOTING
13.1 Troubleshooting of instrument
44
13.2 Error codes and remedies
45
14. SPECIFICATIONS
Specifications
46
47
48
Automatic calibration
Ordering information
49
CODE SYMBOLS
50
SAMPLING SYSTEM BLOCK DIAGLAM
51
Functions of individual components
52
OUTLINE DIAGRAM (Unit:mm)
30
For indoor installation type
30
53
CONNECTION DIAGRAM
Note: Terminal numbers are fixed. (only specified outputs are wired).